Bayshore MRT station

Coordinates: 1°18′53″N 103°56′37″E / 1.314712°N 103.943717°E / 1.314712; 103.943717
From Wikipedia, the free encyclopedia
(Redirected from Bayshore MRT Station)


 TE29 
Bayshore
碧湾
பேஷோர்
Future Mass Rapid Transit (MRT) station
Construction site of the station
General information
Location31 Bayshore Road
Singapore 469958
Coordinates1°18′53″N 103°56′37″E / 1.314712°N 103.943717°E / 1.314712; 103.943717
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Depth22m
Platform levels1
AccessibleYes
History
Opening23 June 2024; 2 months' time (2024-06-23)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Siglap Thomson–East Coast Line
Future service
Terminus
Bedok South
towards Sungei Bedok
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Bayshore
Bayshore station in Singapore

Bayshore MRT station is a future underground Mass Rapid Transit station on the Thomson–East Coast line in Bedok, Singapore, along Bayshore Road.[1]

The station is located in the vicinity of the Bayshore Park, The Bayshore, and Costa Del Sol condominiums, as well as many other private houses and condominiums around Bayshore and Upper East Coast. The station will serve as the eastern terminus of the Thomson–East Coast line from 2024 to 2026, where it would then be replaced by Sungei Bedok when stage five of the line opens.

History[edit]

Site entrance to construction site

On 15 August 2014, LTA announced that Bayshore station would be part of the proposed Thomson–East Coast line (TEL). The station will be constructed as part of Phase 4, consisting of 8 stations between Founders' Memorial and Bayshore, and is expected to be completed in 2024.[2][3][4]

Contract T310 for the design and construction of Bayshore Station and 4.3-kilometre (2.7 mi) associated bored tunnels was awarded to Woh Hup (Private) Ltd – Shanghai Tunnel Engineering Co (Singapore) Pte Ltd Joint Venture at a sum of S$296 million (US$214.26 million) on 21 March 2016. Construction commenced in 2016, with completion in 2024.[5][6][7][8]

Initially expected to open in 2023, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the TEL line completion, and the date was pushed to 2024.[9] On 5 March 2024, the LTA announced that the station will open on 23 June that year.[10][11]

References[edit]

  1. ^ "Stages of Thomson-East Coast Line". www.lta.gov.sg. Land Transport Authority. 15 August 2014. Archived from the original on 17 August 2014. Retrieved 15 August 2014.
  2. ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". www.lta.gov.sg. 19 August 2014. Archived from the original on 19 August 2014. Retrieved 13 February 2020.
  3. ^ "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  4. ^ Goy, Priscilla (15 August 2014). "Thomson-East Coast Line to run through estates in the east including Marine Parade". The Straits Times. Retrieved 14 November 2020.
  5. ^ "LTA Awards Contract to Build World's First Four-In-One Depot". Land Transport Authority. 21 March 2016. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  6. ^ "Project LTA T310 | STECS". stecs2. Retrieved 14 November 2020.
  7. ^ Lim, Adrian (21 March 2016). "Korea-based construction firm to build four-in-one train and bus depot for $1.99 billion". The Straits Times. Retrieved 14 November 2020.
  8. ^ "MRT Contract T310 - Bayshore Station". wohhup.com. Archived from the original on 13 November 2017.
  9. ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Land Transport Authority. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  10. ^ Tjoe, Lee Nian (5 March 2024). "TEL Stage 4 from Tanjong Rhu to Bayshore to open for passenger service on June 23". The Straits Times. Retrieved 5 March 2024.
  11. ^ "Thomson – East Coast Line 4 to Welcome Commuters from 23 June 2024". LTA. Retrieved 5 March 2024.

External links[edit]