English: The Frederikssund railway line was closed in a 12 week period during the summer of 2018, where 35 kilometres of railway line was renewed. The rebuilding was made in 2 steps. The first step was removal of the old track and ballast. The second step was laying out of new ballast and new tracks before the technical installation of signalwires was made.