Dhaka Mass Transit Company Limited
Company type | Government-owned company |
---|---|
Industry | Rapid transit |
Founded | 3 June 2013 |
Headquarters | Probashi Kallyan Bhaban (Level-14), 71, 72, Old Elephant Road, Eskaton Garden, Ramna, , |
Area served | Dhaka metropolis and adjoining areas |
Key people | Mohammad Abdur Rouf (Managing Director) |
Owner | Government of Bangladesh |
Parent | Dhaka Transport Coordination Authority |
Divisions | Road Transport and Highways Division |
Website | dmtcl |
Dhaka Mass Transit Company Limited, commonly known as DMTCL, is a government-owned company responsible for operating Dhaka Metro Rail, a mass rapid transit system in Dhaka and adjoining areas. The company was established on 3 June 2013 under the Companies Act 1994, a law that governs companies in Bangladesh.[1] Out of 5 metro lines planned by the DMTCL, the MRT Line-6 was inaugurated on 28 December 2022 by the Prime Minister Sheikh Hasina.[2]
Vision
[edit]Moving People, Saving Time and Environment [3]
Mission
[edit]To reduce the traffic congestion by providing a fast, safe, reliable, air-conditioned, time-saving, electricity-driven, environment-friendly and remote-controlled public transport system for Dhaka and its adjoining areas. [3]
Time-bound Action Plan 2030
[edit]Bangladesh Government has undertaken the following Time-bound Action Plan 2030 to establish a state-of-the-art robust Mass Rapid Transit (MRT) Network consisting of 6 (Six) Metro Rail routes which will have 104 stations along the total length of 128.741 kilometers line under Dhaka Mass Transit Company Limited (DMTCL). [3]
SL | Name of MRT Route | Phase | Projected year of completion | Type |
1 | MRT Line-6 * | First | 2025 | Elevated |
2 | MRT Line-1 | Second | 2026 | Elevated
and Underground |
3 | MRT Line-5: Northern Route | 2028 | ||
4 | MRT Line-5: Southern Route | Third | 2030 | |
5 | MRT Line-2 | |||
6 | MRT Line-4 |
* In compliance with the Honorable Prime Minister's directives works for the extension of MRT Line-6 from Motijheel to Kamlapur is ongoing. [3]
Metro Rail Network Map for Dhaka and its adjoining areas
[edit]Route length and stations
[edit]The total length of Mass Rapid Transit or Metro Rail Network that is being implemented adhering the Time-bound Action Plan 2030 under Dhaka Mass Transit Company Limited (DMTCL) is 140.701 Kilometers. There will be 67 stations. The Route-based details are as follows: [4]
Name of MRT Line | Length in Kilometer [4] | Number of Station [4] | ||||
Total | Elevated | Underground | Total # | Elevated | Underground | |
MRT Line-6 | 21.26 | 21.26 | - | 17 | 17 | - |
MRT Line-1 | 31.241 | 11.369 | 19.872 | 21 | 07 | 14 |
MRT Line-5:
Northern Route |
20.00 | 06.50 | 13.50 | 14 | 05 | 09 |
MRT Line-5:
Southern Route |
17.20 | 04.10 | 13.10 | 15 | 04 | 11 |
MRT Line-2* | 35.00 | To be finalized after Feasibility Study | ||||
MRT Line-4 * | 16.00 | |||||
Grand Total | 140.701 |
* Approximate Length
Station Names and Route alignment of Metro Rail Lines under Mass Rapid Transit (MRT) Network of Dhaka
[edit]MRT Line-6 [5]
Uttara North – Uttara Center – Uttara South – Pallabi – Mirpur 11- Mirpur 10- Kazipara – Shewrapara – Agargaon – Bijoy Sarani – Farmgate – Karwan Bazar – Shahbagh – Bangladesh Secretariat – Motijheel – Kamlapur
MRT Line-1 [6]
- Airport Route: Airport - Airport Terminal 3 – Khilkhet – Nadda – Natun Bazar - North Badda – Badda – Aftab Nagar – Rampura – Malibag – Rajarbag – Kamlapur
- Purbachal Route: Joar Sahara – Boalia – Mostul – Sheikh Hasina Cricket Stadium – Purbachal Center - Purbachal East – Purbachal Terminal
MRT Line-5: Northern Route [7]
Hemayetpur – Baliarpur – Bilamalia – Amin Bazar – Gabtoli – Dar-us-Salam – Mirpur 1 – Mirpur 10 – Kochukhet – Banani – Gulshan 2 – Natun Bazar - Vatara
Line-5: Southern Route [8]
Gabtoli – Technical – Kallyanpur – Shyamoli – College Gate – Asad Gate – Russel Square – Karwan Bazar – Hatirjheel – Tejgaon – Aftab Nagar – Aftab Nagar Center – Aftab Nagar East – Nasirabad – Dasherkandi
MRT Line-2 (Proposed Route) [9]
- Main Line
Gabtoli – Dhaka Udyan – Mohammadpur Bus Stand – Jhigatola – Science Laboratory – New Market – Azimpur – Palashi – Dhaka Medical College – Gulistan – Motijheel – Kamlapur – Manda – Dakhshingaon – Damripara – Signboard – Bhuighor – Jalkuri – Narayangonj Zilla Sadar
- Branch Line
Gulistan – Naya Bazar – Sadarghat
MRT Line-4 (Proposed Route) [10]
Kamlapur – Sayedabad – Jatrabari – Shonir Akhra – Signboard – Chattogram Road – Kanchpur – Madanpur
References
[edit]- ^ Express, The Financial. "Metro rail company functioning without paid-up capital". The Financial Express. Retrieved 28 December 2022.
- ^ Tribune, Dhaka (21 December 2022). "PM Hasina will be first passenger of metro rail on Dec 28". www.dhakatribune.com. Retrieved 28 December 2022.
- ^ a b c d "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-04. Retrieved 2024-06-04.
- ^ a b c "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-09. Retrieved 2024-06-09.
- ^ "MRT Line-6 or First Elevated Metro Rail of Bangladesh". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-1". DMTCL Website. 2023-10-04. Retrieved 2023-10-04.
- ^ "Route Alignment of MRT Line-5: Northern Route". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-5: Southern Route". DMTCL Website. 2023-11-29. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-2". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-4". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.