LRTA 2000 class
You can help expand this article with text translated from the corresponding article in Japanese. (May 2020) Click [show] for important translation instructions.
|
You can help expand this article with text translated from the corresponding article in Korean. (May 2020) Click [show] for important translation instructions.
|
LRTA 2000 class | |
---|---|
Stock type | Electric multiple unit |
In service | 2003–present |
Manufacturer | Rotem and Toshiba |
Built at | Uiwang, South Korea[1] |
Constructed | 2002–2003 |
Entered service | April 5, 2003 |
Refurbished | 2021 |
Number built | 72 vehicles (18 sets) |
Number in service | 40 vehicles (10 sets) |
Formation | 4 cars per trainset Mc–M–M–Mc |
Fleet numbers | 2001–2072 |
Capacity | 1,628 passengers (232 seats) |
Operators | Light Rail Transit Authority |
Depots | Santolan |
Lines served | Line 2 |
Specifications | |
Car body construction | Stainless steel |
Train length | 93.2 m (305 ft 9+1⁄4 in) |
Car length | 23.3 m (76 ft 5+3⁄8 in) |
Width | 3.2 m (10 ft 6 in) |
Height | 4.1 m (13 ft 5+3⁄8 in) |
Floor height | 1.1 m (3 ft 7+1⁄4 in) |
Platform height | 1.1 m (3 ft 7+1⁄4 in) |
Doors | 5 sets of 55-inch (1.4 m) double-leaf pocket doors per side |
Wheel diameter | 850–790 mm (33–31 in) (new–worn) |
Wheelbase | 2.3 m (7 ft 7 in) |
Maximum speed | 80 km/h (50 mph) (design)[2] 60 km/h (37 mph) (service) |
Weight | 160.1 t (353,000 lb)
|
Axle load | 16.85 t (37,100 lb) |
Steep gradient | 5% |
Traction system | Toshiba[3]/Woojin[4] IGBT–VVVF |
Traction motors | 16 × 120 kW (160 hp) 3-phase AC induction motor |
Power output | 1.92 MW (2,570 hp) |
Transmission | Westinghouse-Natal (WN) drive |
Acceleration | 1.3 m/s2 (4.3 ft/s2) |
Deceleration | 1.3 m/s2 (4.3 ft/s2) (service) 1.5 m/s2 (4.9 ft/s2) (emergency) |
Auxiliaries | 3,300-volt IGBT PWM static inverter (160 kVA) 110 V DC batteries |
HVAC | Carrier 72FB-400X roof-mounted air-conditioning |
Electric system(s) | 1,500 V DC overhead catenary |
Current collector(s) | Single-arm pantograph |
UIC classification | Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′ |
Bogies | Bolsterless type |
Braking system(s) | Regenerative, rheostatic, and electro-pneumatic |
Safety system(s) | Siemens[note 1] TBS100 ATO/ATP |
Coupling system | Shibata close-contact (cab ends) Semi-permanent (non-cab ends) |
Seating | Longitudinal |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes/references | |
Sourced from [5][6][7][8][9][10][11][12][13] unless otherwise noted. |
The LRTA 2000 class is a class of electric multiple units in operation on the LRT Line 2, manufactured by Rotem and Toshiba.[7]
A total of seventy-two cars configurable to eighteen train sets were manufactured from 2002 to 2003 under the fourth package contract of the initial construction of Line 2.
Operational history
[edit]Purchase and production
[edit]The project's fourth package, which involved communications and fare systems, vehicles, and trackwork, had eight bidders submit bids in July 1997. The selected firms included: Sumitomo in partnership with GEC Alsthom (now Alstom), Alcatel, Barclays, and Meidensha Corporation; MMC Consortium made up of Mitsubishi Heavy Industries, Mitsubishi Corporation, and Hyundai Presicion (which later merged to become Rotem and was renamed Hyundai Rotem), with John Holland, Mitsubishi Electric, and Union Switch & Signal as subcontractors; CCDET Consortium consisting of Spanish companies Construcciones y Auxiliar de Ferrocarriles, Elecnor, Curbertas y MZOV (now Acciona), Dimetronic, and Tomen as subcontractors; USJP Consortium consisting of Nissho Iwai (now Sojitz Corporation), Raython Ebasco Overseas, General Railway Signal, and Nippon Sharyo; Kanemastu Corporation and Ansaldo SPA (now Hitachi Rail Italy) consortium with subcontractors Breda Construzioni, Hanjin Heavy Industries (later merged to become Rotem and renamed Hyundai Rotem) and Spie Entrans SA; Siemens/Mitsui consortium with Marta Transport as subcontractors; Asia-Europe MRT Consortium comprising Marubeni, Balfour Beatty, Toshiba, and Daewoo Heavy Industries (which later merged to form Rotem and was renamed Hyundai Rotem), with subcontractors GPT International and GEC Alsthom; and AdTranz, ABB Power, and Itochu Corporation consortium.[14]
In 1998, several Japanese companies participated in the bidding for the rolling stock for the LRT Line 2, which, according to Senator Juan Ponce Enrile, were hounded with alleged anomalies.[15] Although it was promptly corrected by the Estrada administration after it assumed power in the middle of that year, it also encountered similar anomalies in May 2000, such as the disqualification of two bidders in the final evaluation for the project. Only two bidders, Ansaldo, and Mitsui with Siemens, passed the technical evaluation process.[16]
In September 2000, the AEMC[note 2] secured the fourth package contract. AEMC won over the other bid, MMH Consortium.[note 3][17]
Seventy-two train cars (18 sets) were produced by Rotem (now Hyundai Rotem) between 2002 and 2003.[5] These were built in Uiwang, Gyeonggi-do, South Korea.[1] Hyundai Rotem constructed the main car body while Toshiba provided the electric components. The first four train sets arrived in November 2002, while the remaining fourteen were delivered in the succeeding months.[1]
Mainline operations
[edit]By 2014, twelve out of the eighteen sets remained in service.[18] By May 2019, it was reduced to eight following a collision involving two train sets,[19] and by October, further reduced to five following a power supply incident.[20] By July 2021, running trains were increased to six after the opening of the east extension,[21] subsequently increased to eight. Currently, eight trains are operational, while the other trains are being repaired/overhauled or awaiting spare parts.
Upgrades
[edit]On April 16, 2018, the Light Rail Transit Authority signed a contract with Multi-Scan Corporation and MRail, Inc. for the replacement of 80 air-conditioning units in ten train sets. It used parts from the original equipment manufacturer of the air-conditioning units, Carrier Corporation.[22] The replacement of air-conditioning units started on March 7, 2019,[23] and was completed the following May 24.[24]
Rehabilitation of three trains started on March 3, 2021. AMSCO JV,[note 4] the then-maintenance provider of Line 2, started the installation of new train propulsion systems and train monitoring systems from Woojin Industrial Systems in three trains in order for those to return to service ahead of the original scheduled opening of the east extension the following April.[4] The refurbishment was completed in the same year.[26]
Design
[edit]Car body
[edit]The car body is made of stainless steel, and the under frame shares the similar material with LAHT steel. The trains sport a livery of yellow and purple cheatlines. The upper yellow lines represent mango, the unofficial national fruit, while the thicker purple lines are based from the ube, sporting a geometric ethnic design.[1]
The trains have round front ends, which bears resemblance to the second-generation Korail Class 311000 (Seoul Subway Line 1), 341000 (Seoul Subway Line 4), and 351000 (Suin–Bundang Line); these EMUs are also manufactured by Rotem (or then KOROS).[27]
Each car has two roof-mounted air-conditioning units manufactured by Carrier with a cooling capacity of 40,400 kilocalories (169,000 kJ) per hour.[6] In total, there are eight air-conditioning units in a single train set.[22]
Trains prominently use wrap advertising. Certain train sets feature upgraded signages, now in LED, instead of sign scrolls.
-
2000 class with newer LED signage at Recto station
-
Carrier roof-mounted air conditioning units
Interior
[edit]The inner train space is lined with melamine and/or polyester faced ply metal. The windows are tinted safety glass, and the longitudinal seats are made of fiberglass reinforced plastics.[28] The seats have a length of 1.6 to 2.4 meters (5 ft 3 in to 7 ft 10 in).[29] The flooring is of stainless steel keystone plate and a thick, nonslip covering. Open gangways are present in between cars with a width of 1.5 meters (4 ft 11 in). In 2017, some trains were retrofitted with the Passenger Assist Railway Display System (now known as TUBE), a passenger information system powered by LCD screens installed near the inner ceiling of the trains that shows news, advertisements, current train location, arrivals and station layouts.[30] However, as of 2022, the LCD screens remain switched off and unutilized.
-
Route map above a light indicator
-
Longitudinal seats
-
Builder's plate and a CCTV camera
Electrical and mechanical
[edit]Each car has two bolsterless bogies underneath the car with an axle length of 2.2 meters (7 ft 3 in).[12] The primary suspension consists of an elastomeric spring and the secondary suspension is a diaphragm air spring.[31] Mechanical Shibata couplers are present at the ends of the driver cabs, along with anti-climbers above it. Semi-permanent couplers are present in between cars (non-cab ends).[28]
The traction system consists of VVVF inverters controlled by IGBT semiconductors. Two alternating current induction motors with a power output of 120 kilowatts (160 hp) are mounted on each bogie.[32] Toshiba supplied the original VVVF controller and propulsion systems,[3] while Woojin Industrial Systems supplied the new propulsion systems for three train sets.[4] Its auxiliaries consist of 3,300-volt static inverters and 110-volt DC batteries.[33]
-
Bolsterless bogie of the 2000 class
-
New VVVF inverter from Woojin Industrial Systems
Train formation
[edit]The configuration of a four-car trainset is Mc1–M1–M2–Mc2. All cars are powered and equipped with traction motors; Mc denotes a driving car while M denotes an intermediate car.
Car type[32] | Mc | M | |
---|---|---|---|
Quantity | 2 | ||
Control cab | |||
Motor | |||
VVVF inverter | |||
Pantograph | |||
Car length | m | 23.3 | |
ft in | 76 ft 5.3 in | ||
Capacity[31] | Seated | 54 | 64 |
Standing | 338 | 360 | |
Total | 392 | 422 |
Fleet list
[edit]Set No. | 1 | 2 | 3 | 4 | Status | Notes |
---|---|---|---|---|---|---|
1 | 2001 | 2002 | 2003 | 2004 | Active | — |
2 | 2005 | 2006 | 2007 | 2008 | For repair/restoration | |
3 | 2009 | 2010 | 2011 | 2012 | Active | |
4 | 2013 | 2014 | 2015 | 2016 | ||
5 | 2017 | 2018 | 2019 | 2020 | No plans to repair | |
6 | 2021 | 2022 | 2023 | 2024 | ||
7 | 2025 | 2026 | 2027 | 2028 | For repair/restoration | |
8 | 2029 | 2030 | 2031 | 2032 | Active | |
9 | 2033 | 2034 | 2035 | 2036 | Fitted with new Woojin propulsion system[25] | |
10 | 2037 | 2038 | 2039 | 2056 | No plans to repair | — |
11 | 2041 | 2042 | 2043 | 2044 | For repair/restoration | |
12 | 2045 | 2046 | 2047 | 2048 | No plans to repair | |
13 | 2049 | 2050 | 2051 | 2052 | Active | Involved in 2019 collision; restored in 2021[25] |
14 | 2053 | 2054 | 2055 | 2040 | Fitted with new Woojin propulsion system[25] | |
15 | 2057 | 2058 | 2059 | 2060 | For repair/restoration | — |
16 | 2061 | 2062 | 2063 | 2064 | Active | |
17 | 2065 | 2066 | 2067 | 2068 | Fitted with new Woojin propulsion system[25] | |
18 | 2069 | 2070 | 2071 | 2072 | Involved in 2019 collision; restored in 2021[25] |
Incident
[edit]On May 18, 2019, two trains collided between Araneta Center-Cubao and Anonas, injuring 34 passengers with none in critical condition.[34][35] Revenue operations were suspended to give way for maintenance checks; operations resumed at 10:47 a.m. the next day.[36]
The incident started at 2:09 p.m. when trainset no. 13 broke down at Katipunan station after the train's static inverters, which powers the electrical and braking systems, failed.[37] The defective train was subsequently moved to the pocket track near Anonas station, waiting to be towed back to the depot. However at 9:15 p.m., the train was reported to have moved on its own towards the eastbound track going towards Santolan station, after its air pressure slowly dissipated, causing the brake shoes of train no. 13 to loosen.[37] The downward slope of the pocket track also caused the train to move on its own.[37] At this time, trainset no. 18 was going towards Santolan station from Araneta Center-Cubao on the same track. The runaway train was reported via radio but eventually rear-ended train no. 13. The driver of one of the two trains was reported to have jumped out of his train before the collision, sustaining wounds and bruises.[37]
Both trains involved were subsequently repaired and returned to service in September 2021.[25]
See also
[edit]Notes
[edit]- ^ Invensys Rail Dimetronic/Westinghouse Signals were the original suppliers of the signaling system of the LRT Line 2; Siemens AG acquired the companies in 2013 and was amalgamated into Siemens Mobility.
- ^ A consortium led by Marubeni Corporation and consisting of Balfour Beatty, Toshiba, Daewoo Heavy Industries, and D.M. Consuji Incorporated (DMCI).
- ^ A consortium composed of Mitsubishi Heavy Industries, Mitsubishi Corporation, and Hyundai Precision & Industries.
- ^ Joint venture of Autre Porte Technique Global Inc., Multi-Scan Corporation, and Opus Land Inc.[25]
References
[edit]- ^ a b c d "Ultra modern Line 2 trains arrive at Manila". Manila: Philstar. November 24, 2002. Retrieved May 23, 2020.
- ^ "Coming soon: Faster, more modern trains". The Philippine Star. December 25, 2002. Retrieved May 7, 2023.
- ^ a b "Dōnyū jisseki: Tetsudō shisutemu: Tōshiba (Ajia Oseania)" 導入実績:鉄道システム:東芝(アジア・オセアニア) [Toshiba installation record for railway systems (Asia/Oceania)]. Toshiba. Archived from the original on November 13, 2018. Retrieved June 12, 2020.
- ^ a b c Cordero, Ted (March 11, 2021). "LRT2 to add more running trains by April, says LRTA". GMA News. Retrieved December 13, 2021.
- ^ a b Rotem. Total Rail Systems Division. (January 2005). "Rotem Ranks 3rd in Global Metro System Supply: SCI" (PDF). Rolling into the Future. 1: 5. Archived from the original (PDF) on July 23, 2011. Retrieved January 10, 2022 – via www.industrykorea.net.
- ^ a b "철도차량용 냉방기 소개" [Air-conditioners for railway cars]. carrier.co.kr (in Korean). Retrieved November 9, 2021.
- ^ a b "Project Record: Philippines Manila Line 2 EMU". Hyundai Rotem. Archived from the original on March 9, 2022. Retrieved July 17, 2016.
- ^ JICA 2011, p. 3-42.
- ^ DOTC & LRTA 2014, p. 9.
- ^ Light Rail Transit Authority 2017, p. 15-17.
- ^ Light Rail Transit Authority 2020a, p. 59.
- ^ a b Hyundai Rotem 2011, p. 22.
- ^ Light Rail Transit Authority 2020b, p. RS-168.
- ^ "LRT II draws 8 foreign bidders". Manila Standard. July 26, 1997.
- ^ "Anomaly in LRT-2 bidding - Enrile". Today. February 3, 1998.
- ^ "LRT 2 bidding hounded by alleged anomalies". Philstar.com. May 3, 2000. Retrieved May 20, 2024.
- ^ Reyes, Miguel Paolo P. "It's Not You, It's Me? An Inquiry into the Problems of Philippine-Korean Cooperation for Metro Manila's Rail-based Mass Transit Systems" (PDF). The Mass Transit System in Metro Manila: From Tranvia to MRT, 1879-2014. University of the Philippines Diliman. Retrieved May 29, 2024.
- ^ DOTC & LRTA 2014, p. 5.
- ^ Cipres, Fred; Dava, Bianca (May 19, 2019). "34 hurt in LRT-2 collision; longer wait times seen". ABS-CBN News. Manila: ABS-CBN. Archived from the original on May 19, 2019. Retrieved May 15, 2020.
- ^ Popioco, Makoi (October 8, 2019). "Only 5 trains to run as LRT-2 resumes partial operations". CNN Philippines. Archived from the original on December 6, 2021. Retrieved December 6, 2021.
- ^ San Jose, Christian (July 5, 2021). "LRT-2 East extension now open and free for 2 weeks, but not all commuters are happy". NOLISOLI.PH. Retrieved December 6, 2021.
- ^ a b "LRT-2 to start Systematic Replacement of Trains' Air-Conditioning System". PTV News. People's Television Network. April 21, 2018. Retrieved November 3, 2021.
- ^ Rita, Joviland (March 7, 2019). "Expect 'cooler' LRT2 trains as aircon units undergo temporary fix before being replaced". GMA News. Retrieved November 3, 2021.
- ^ "LRTA refurbishes LRT-2 stations, completes train air-con replacement". Light Rail Transit Authority. June 24, 2019. Archived from the original on November 3, 2021. Retrieved November 3, 2021.
- ^ a b c d e f g LRTA 2021, p. 9.
- ^ Status of LRT Projects as of December 31, 2021 (PDF) (Report). Light Rail Transit Authority. January 19, 2022. p. 3. Archived from the original (PDF) on January 31, 2022. Retrieved March 8, 2022.
- ^ "Hyundai Rotem Portfolio". Hyundai Rotem. 2009. Retrieved May 23, 2020.
- ^ a b Light Rail Transit Authority 2017, p. 16.
- ^ Light Rail Transit Authority 2020b, p. 1148-1149.
- ^ "Line 2 unveils PARDS for passengers". Metro Manila: ABS-CBN. ANC. May 6, 2017. Archived from the original on November 13, 2023. Retrieved December 6, 2021.
{{cite news}}
: CS1 maint: unfit URL (link) - ^ a b Light Rail Transit Authority 2017, p. 17.
- ^ a b Light Rail Transit Authority 2017, p. 15.
- ^ Light Rail Transit Authority 2020b, p. RS-170.
- ^ Barcelon, Paolo (May 19, 2019). "Authorities to probe Line 2 collision that injured 34". CNN Philippines. Archived from the original on May 19, 2019. Retrieved July 13, 2021.
- ^ Rita, Joviland (May 19, 2019). "Probe underway into Line 2 trains collision; 34 hurt". GMA News Online. Retrieved May 19, 2019.
- ^ Dava, Bianca (May 19, 2019). "LRT-2 resumes operations after train collision". ABS-CBN News. Archived from the original on December 15, 2023. Retrieved July 13, 2021.
- ^ a b c d REPORT OF THE FACT-FINDING COMMITTEE ON THE LRT LINE 2 TRAIN COLLISION ON 18 MAY 2019 BETWEEN TRAINSET 13 AND TRAINSET 18 ON THE EAST BOUND TRACK BETWEEN ANONAS AND CUBAO STATIONS (PDF) (Report). Light Rail Transit Authority. May 24, 2019. pp. 2–5, 13, 36, 46–52. Archived (PDF) from the original on December 28, 2021. Retrieved December 28, 2021.
Sources
[edit]- Department of Transportation and Communications; Light Rail Transit Authority (September 2014). LRT LINE 2 OPERATIONS AND MAINTENANCE PROJECT (PDF) (Report). Public-Private Partnership Center, Philippines. Retrieved May 23, 2020.
- Hyundai Rotem (2011). Hyundai Rotem's Experiences and New Solutions (Report). Hyundai Rotem Company. Retrieved February 28, 2022.
- Japan International Cooperation Agency; Oriental Consultants Co., Ltd.; Katahira & Engineers International; Tonichi Engineering Consultants, Inc. (October 2011). PREPARATORY STUDY FOR LRT LINE2 EXTENSION PROJECT FINAL REPORT (PDF) (Report). Retrieved January 9, 2022.
- Light Rail Transit Authority (August 9, 2017). "Maintenance of the Manila LRT Line 2 System, Terms of Reference" (PDF). Archived (PDF) from the original on June 12, 2020. Retrieved May 23, 2020.
- Light Rail Transit Authority (July 29, 2020a). "Bidding Documents - Contract for the Supply of Various Spare Parts (Static Inverter IGBT, Static Inverter Gate Drive Unit, and SIV Fuse)" (PDF). Archived from the original (PDF) on February 18, 2022. Retrieved February 18, 2022.
- Light Rail Transit Authority (August 27, 2020b). "Bidding of the Design-and-Build Contract for One (1) Lot for LRT Line 2 West Extension Project" (PDF). Archived from the original (PDF) on December 15, 2023. Retrieved March 15, 2022.
- Light Rail Transit Authority (March 2022). Year-End Accomplishment Report (CY 2021) (PDF) (Report). Retrieved March 19, 2022.