Jump to content

Atlalilco metro station

Coordinates: 19°21′22″N 99°06′05″W / 19.356134°N 99.101315°W / 19.356134; -99.101315
From Wikipedia, the free encyclopedia
(Redirected from Metro Del Paso)
Atlalilco
Mexico City Metro
STC rapid transit
General information
LocationMexico
Coordinates19°21′22″N 99°06′05″W / 19.356134°N 99.101315°W / 19.356134; -99.101315
Operated bySistema de Transporte Colectivo (STC)
Line(s)Mexico City Metro Line 8 (Garibaldi / Lagunilla - Constitución de 1917)
Mexico City Metro Line 12 (Observatorio - Tláhuac)
Platforms4 side platforms
Tracks4
Construction
Structure typeUnderground
Accessibleyes[1]
Other information
StatusIn service
History
OpenedMexico City Metro Line 8 20 July 1994
Mexico City Metro Line 12 30 October 2012
Key dates
3 May 2021 (2021-05-03)Mexico City Metro Line 12 Temporarily closed
15 January 2023 (2023-01-15)Mexico City Metro Line 12 Reopened[2]
Passengers
2023Total: 11,350,211
Mexico City Metro Line 8 5,005,606[3]
Mexico City Metro Line 12 6,344,605[3]Increase 107.75%
RankMexico City Metro Line 8 94/195[3]
Mexico City Metro Line 12 70/195[3]
Services
Preceding station Mexico City Metro Following station
Escuadrón 201 Line 8 Iztapalapa
Mexicaltzingo Line 12 Culhuacán
toward Tláhuac
Location
Atlalilco is located in Mexico City
Atlalilco
Atlalilco
Location within Mexico City
Map
Area map

Atlalilco is a station along Line 8 and Line 12 of the metro of Mexico City.[4][5] Atlalilco is a transfer station between the Line 12 and Line 8.[6] Line 8 station is located on the Calzada Ermita Iztapalapa, while Line 12 station is located on Avenida Tláhuac, in the Colonia Santa Isabel Industrial neighbourhood.[4]

The station's logo is a well of water. Atlalilco in Nahuatl means: "where water is kept".[4] It opened for service along Line 8 on 20 July 1994.[7] The distance of the interstation tunnel is about 800 m (2,625 ft) long because the original plan for a transfer station to be named Axomulco was canceled.[8] The interstation tunnel runs underground through Calzada Ermita Iztapalapa and Avenida Tlahuac, with an additional access to the station at the intersection of both avenues. It is the only station that has mechanical bands to assist in the interstation walk.

Ridership

[edit]
Annual passenger ridership (Line 8)
Year Ridership Average daily Rank % change Ref.
2023 5,005,606 13,713 94/195 −10.84% [3]
2022 5,614,055 15,380 71/195 +21.63% [3]
2021 4,615,611 12,645 58/195 +45.23% [9]
2020 3,178,039 8,683 113/195 −43.36% [10]
2019 5,611,383 15,373 117/195 −1.47% [11]
2018 5,694,912 15,602 116/195 +8.04% [12]
2017 5,271,085 14,441 121/195 −3.98% [13]
2016 5,489,819 14,999 120/195 −1.50% [14]
2015 5,573,190 15,269 112/195 +2.72% [15]
2014 5,425,564 14,864 110/195 −1.84% [16]
Annual passenger ridership (Line 12)
Year Ridership Average daily Rank % change Ref.
2023 6,344,605 17,382 70/195 NA [3]
2022 0 0 176/195 −100.00% [17]
2021 847,723 2,322 183/195 −71.20% [9]
2020 2,943,812 8,043 119/195 −42.42% [10]
2019 5,112,833 14,007 127/195 +4.10% [11]
2018 4,911,648 13,456 127/195 +7.90% [12]
2017 4,551,908 12,470 131/195 +1.21% [13]
2016 4,497,651 12,288 133/195 −67.05% [14]
2015 13,651,138 37,400 27/195 −6.14% [15]
2014 14,544,147 39,846 23/195 +319.58% [16]

References

[edit]
  1. ^ "12 datos de la 'La línea dorada' del Metro inaugurada este martes" (in Spanish). Aristegui Noticias. 30 October 2012. Retrieved 26 May 2020.
  2. ^ Navarrete, Shelma (15 January 2023). "A 20 meses del desplome de la Línea 12, reabren tramo Mixcoac-Atlalilco". Expansión (in Spanish). Archived from the original on 15 January 2023. Retrieved 15 January 2023.
  3. ^ a b c d e f g "Afluencia de estación por línea 2023" [Station traffic per line 2023] (in Spanish). Sistema Transporte Colectivo Metro. 2024. Archived from the original on 27 January 2024. Retrieved 24 January 2024.
  4. ^ a b c "Atlalilco" (in Spanish). Archived from the original on 8 August 2011. Retrieved 30 July 2011.
  5. ^ Archambault, Richard. "Atlalilco » Mexico City Metro System". Retrieved 30 July 2011.
  6. ^ "Linea 12 - Linea Dorado" (in Spanish). Archived from the original on 17 September 2011. Retrieved 8 August 2011.
  7. ^ Monroy, Marc. Schwandl, Robert (ed.). "Opening Dates for Mexico City's Subway". Retrieved 2 August 2011.
  8. ^ "Solicitarán Diputados Auditar Proyecto de Línea 12 del Metro y Transparentar su Ejecución" (in Spanish). Asamblea Legislativa del Distrito Federal. 10 February 2010. Retrieved 22 May 2013.
  9. ^ a b "Afluencia de estación por línea 2021" [Station traffic per line 2021] (in Spanish). Sistema Transporte Colectivo Metro. 2020. Archived from the original on 7 March 2022. Retrieved 7 March 2022.
  10. ^ a b "Afluencia de estación por línea 2020" [Station traffic per line 2020] (in Spanish). Sistema Transporte Colectivo Metro. 2021. Archived from the original on 21 June 2021. Retrieved 21 June 2021.
  11. ^ a b "Afluencia de estación por línea 2019" (in Spanish). Sistema Transporte Colectivo Metro. 2020. Archived from the original on 8 April 2020. Retrieved 3 May 2020.
  12. ^ a b "Afluencia de estación por línea 2018" (in Spanish). Sistema Transporte Colectivo Metro. 2019. Archived from the original on 6 June 2019. Retrieved 7 April 2020.
  13. ^ a b "Afluencia de estación por línea 2017" (in Spanish). Sistema Transporte Colectivo Metro. 2019. Archived from the original on 3 May 2020. Retrieved 3 May 2020.
  14. ^ a b "Afluencia de estación por línea 2016" (in Spanish). Sistema Transporte Colectivo Metro. 2017. Archived from the original on 3 May 2020. Retrieved 3 May 2020.
  15. ^ a b "Afluencia de estación por línea 2015" (in Spanish). Sistema Transporte Colectivo Metro. 2016. Archived from the original on 3 May 2020. Retrieved 6 May 2020.
  16. ^ a b "Afluencia de estación por línea 2014" (in Spanish). Sistema Transporte Colectivo Metro. 2015. Archived from the original on 3 May 2020. Retrieved 6 May 2020.
  17. ^ "Afluencia de estación por línea 2022" [Station traffic per line 2022] (in Spanish). Sistema Transporte Colectivo Metro. 2023. Archived from the original on 5 March 2023. Retrieved 5 March 2023.
[edit]