Bazhong–Dazhou railway

From Wikipedia, the free encyclopedia

The Bazhong–Dazhou railway (Chinese: 巴达铁路) is a railway line in Sichuan, China.

History[edit]

Construction on the line began on 27 September 2009. It opened on 10 January 2016.[1][2]

Specification[edit]

At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station.[3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph).[1]

References[edit]

  1. ^ a b "巴达铁路正式通车 巴中到重庆仅5个多小时". Sina (in Chinese). 2016-01-11. Archived from the original on 2016-09-17. Retrieved 2021-12-03.
  2. ^ "巴达铁路正式通车" (in Chinese). CTN. 2016-01-11. Retrieved 2021-12-03.
  3. ^ "巴达铁路(达州段)建设工程全速推进". The People's Government of Sichuan Province (in Chinese). 2011-05-09. Archived from the original on 2011-10-28. Retrieved 2021-12-06.