Changsha–Ganzhou high-speed railway

From Wikipedia, the free encyclopedia
Changsha–Ganzhou
high-speed railway
长赣高速铁路
Overview
StatusPlanned
Termini
Service
Operator(s)China Railway High-speed
Technical
Line length420.9 km (262 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Changsha–Ganzhou high-speed railway is a planned high-speed railway in China.[1]

The line will be 420.9 kilometres (261.5 mi) long and have a design speed of 350 kilometres per hour (220 mph).[2] It will be part of the Xiamen–Chongqing corridor[3] and will be completed and operational within December 2026.

Stations[edit]

Station Name Chinese Metro transfers/connections
Changsha South 长沙南 Changsha Metro  2   4   Maglev 
Changsha West 长沙西 Changsha Metro  2  (West ext., U/C)
Huanghua Airport 黄花机场 Changsha Metro  6   Maglev 
Liuyang 浏阳
Shangli 上栗
Pingxiang North 萍乡北
Lianhua 莲花
Yongxin 永新
Jinggangshan East 井冈山东
Suichuan 遂川
Ganzhou West 赣州西
Ganzhou North 赣州北

References[edit]

  1. ^ "长赣铁路要来啦!江西境内设这些站!安九高铁有新进展". Sina. 2021-04-11. Archived from the original on 2021-07-25. Retrieved 2021-07-25.
  2. ^ "定了!长赣铁路今年开建,时速350公里" [It's set! Changsha-Ganzhou high-speed railway will start construction this year, speed of 350 km/h]. rednet.cn (in Chinese). 25 March 2020. Retrieved 14 February 2021.
  3. ^ "长赣高铁传来新消息,经过江西这些地方!". 网易. 2021-04-14. Archived from the original on 2021-05-13. Retrieved 2021-05-12.