Fatih (drillship)

From Wikipedia, the free encyclopedia
History
Turkey
Name
  • Fatih
  • Deepsea Metro II (2011–2018)
NamesakeSultan Mehmed II, known as Fatih, "conqueror"
Owner
Operator
BuilderHyundai Heavy Industries, Ulsan, South Korea
Launched25 November 2011
Identification
StatusIn active service
General characteristics
Tonnage
Length229.19 m (751.9 ft)
Beam36 m (118 ft)
Draft16.1 m (53 ft)
Speed
  • 7.2 kn (13.3 km/h) (service)
  • 8.6 kn (15.9 km/h) (max)
ArmamentNone

Fatih, ex Deepsea Metro II, is a Turkey-flagged sixth generation ultra deepwater drillship owned and operated by the state-owned Turkish Petroleum Corporation (TPAO). She is Turkey's first drillship.

Name[edit]

Fatih means "Conqueror" in Turkish.

The three drillships of the state-owned Turkish gas company, Fatih, Yavuz and Kanuni, are named after the most famous conquerors and rulers of the Ottoman Empire: Mehmed I (r. 1444-1446, 1451-1481), Turkish: Fatih Sultan Mehmet, Mehmed the Conqueror, who conquered Constantinople; Selim I (r. 1512-1520), known as Selim the Resolute, Turkish: Yavuz Sultan Selim, who hugely expanded his empire; and Suleiman the Magnificent (r. 1520-1566), known in Turkish as Kanunî Sultan Süleyman ("the Lawgiver"), under whom the empire reached its apex.

History[edit]

Fatih was built by Hyundai Heavy Industries in Ulsan, South Korea at a cost of nearly US$ 860 million,[1][2] and launched on 25 November 2011.[3][4] Initially named Deepsea Metro II, she was owned by Chloe Marine in Hamilton, Bermuda and was operated by Odfjell Drilling in Bergen, Norway, sailing under a Marshall Islands flag until 2018.[4] In early 2012, she sailed to South Africa to undergo modifications at the DCD-Dorbyl Marine shipyard in Cape Town.[3]

From May 2012, she was active offshore Brazil for Petrobras. The three-year contract valued at US$ 531 million.[1][3] In May 2015, the work concluded. The drill was stacked on the Curaçao island, Venezuela because no other orders were received for her service.[1][2]

In March 2016, she was sold to Chalfont Shipping Ltd. for US$ 210 million.[1][2]

At the end of 2017, she was purchased by the Türkiye Petrolleri Anonim Ortaklığı (TPAO), a company of the Ministry of Energy and Natural Resources and renamed Fatih ("Conqueror").[5][6][7] Fatih is expected to carry out deepwater drilling for petroleum and natural gas in the Black Sea and Mediterranean Sea. She is Turkey's first drillship.[6][8] After completing the preparation works, she was commissioned in May 2018 to carry out drilling work in the Mediterranean Sea.[5][9]

Characteristics[edit]

The sixth generation ultra deepwater drillship is 229.19 m (751.9 ft) long,[1] with a beam of 36 m (118 ft) and a draught of 16.1 m (53 ft). Assessed at 51,283 GT and 34,256 DWT, she has a maximum speed of 8.6 kn (15.9 km/h) and a speed of 7.2 kn (13.3 km/h) in service.[4][10] The vessel is able to carry out drilling at a sea depth up to 8,000 ft (2,400 m) and has a maximum drill depth of 40,000 ft (12,000 m).[1][7][8]

Following her arrival in Turkey, the vessel was equipped with Managed Pressure Drilling system after she was maintained.[11] The drilling works of the vessel are supported by an in-Turkey-developed remotely operated underwater vehicle Kaşif.[12]

Exploration works[edit]

The vessel was commissioned on 29 October 2018 for deep-sea drilling at Alanya-1 field in Eastern Mediterranean Sea. Later, she was deployed to Finike-1 field in the same sea.[11]

For drilling in Black Sea, the vessel passed through Bosphorus northwards on 29 May 2020 to Tuna-1 field.[13] On 21 August 2020, it was announced that a natural gas reserve of 320 km3 (77 cu mi) was explored at the field she has been conducting drilling 170 km (110 mi) off Zonguldak since 20 July.[11] Mid October 2020, it was announced that an additional gas reserve of 85 km3 (20 cu mi) was explored at 4,445 m (14,583 ft) depth. The total reserve explored at Tuna-1 field amounts so to 405 km3 (97 cu mi).[12]

See also[edit]

  • Yavuz (ex Deepsea Metro I), sister ship and Turkey's second drillship (2018)
  • Kanuni (ex Sertao), Turkey's third drillship (2020)
  • Abdülhamid Han (ex Cobalt Explorer), Turkey's fourth drillship (2021)

References[edit]

  1. ^ a b c d e f "Deepsea Metro II". Oilships. 22 May 2017. Retrieved 1 November 2018.
  2. ^ a b c "Drillship Sold For A Mere $210 Million". Offshore Post. 29 March 2016. Archived from the original on 3 March 2018. Retrieved 1 November 2018.
  3. ^ a b c "eepsea Metro II Arrives at Shipyard in Cape Town, South Africa". World Maritime News. 9 January 2012. Archived from the original on 3 March 2018. Retrieved 1 November 2018.
  4. ^ a b c "Fatih". Baltic Shipping. Retrieved 1 November 2018.
  5. ^ a b "Drilling vessel Fatih to set sail this week for first mission in Mediterranean". Hürriyet Daily News. 20 October 2018. Retrieved 31 October 2018.
  6. ^ a b "'Deepsea Metro-2' Türkiye için yola çıktı!". NTV (in Turkish). 19 December 2017. Retrieved 1 November 2018.
  7. ^ a b "'Türkiye'nin ilk sondaj gemisi' İzmit Körfezi'nde". NTV (in Turkish). 30 December 2017. Retrieved 1 November 2018.
  8. ^ a b "İlk sondaj gemimiz Deepsea Metro-2 Türkiye'de". TRT Haber (in Turkish). 1 January 2018. Retrieved 1 November 2018.
  9. ^ "Sondaj gemisi 'Fatih' Akdeniz'e uğurlandı". Hürriyet (in Turkish). 31 May 2018. Retrieved 1 November 2018.
  10. ^ "Fatih Drill ship". Marine Traffic. Retrieved 1 November 2018.
  11. ^ a b c "Doğal gaz bulundu: Türkiye'nin kaç sondaj ve sismik araştırma gemisi var, nerelerde arama yapıyorlar?". BBC (in Turkish). 21 August 2020. Retrieved 23 August 2020.
  12. ^ a b "Cumhurbaşkanı Erdoğan doğalgaz rezervini açıkladı: Toplam doğalgaz rezervi 405 milyar metreküp". NTV (in Turkish). 17 October 2020. Retrieved 20 October 2020.
  13. ^ "Fatih sondaj gemisi Karadeniz'e doğru yola çıktı". CNN Türk (in Turkish). 29 May 2020. Retrieved 23 August 2020.