Haripur Nuclear Power Plant

From Wikipedia, the free encyclopedia
Haripur Nuclear Power Plant
CountryIndia
Statusapproved 'in principle'
Owner(s)Nuclear Power Corporation of India
Nuclear power station
Reactor typeVVER
Reactor supplierRosatom
Cooling sourceBay of Bengal
Power generation
Make and modelVVER-1000/412

Haripur Nuclear Power Plant (or Haripur NPP) is a proposed nuclear power station by Nuclear Power Corporation of India (NPCIL), that is intended to be constructed at Haripur village in Purba Midnapore district, West Bengal.[1]

History[edit]

Against the backdrop of the Indo-US Civilian Nuclear Deal, the Nuclear Power Corporation of India (NPCIL) proposed the establishment of a nuclear power plant in Haripur, West Bengal. The then state government, under Chief Minister Buddhadev Bhattacharya, granted initial approval for project planning and land acquisition. However, the proposal faced strong opposition from opposition parties, as well as from environmentalists, farmers, and activists.[2][3]

The project was revived in 2009 during a visit by then-Prime Minister Manmohan Singh to Russia. India signed a civil nuclear agreement with Russia, under which Russia committed to supplying 20 nuclear reactors to India, including six VVER-1000 type reactors to be installed in Kundankulam and another six in Haripur, West Bengal.[4] Nevertheless, this move was met with significant resistance from various political parties, activists, and NGOs, who argued that constructing a nuclear power plant in West Bengal's prime agricultural and fishery areas would severely impact the local economy, endangering livelihoods and posing radiation hazards.[5] Consequently, due to intense opposition and a change in government in 2011, the Trinamool Congress-led state government of West Bengal shelved the project.[6][7]

However, the project resurfaced in 2018 when the Department of Atomic Energy (DAE) granted preliminary approval and financial sanction for the construction of six 1000 MW capacity nuclear reactors in Haripur.[8] As of now, there has been no official confirmation from either the Central Government or the State Government regarding the current status of the project.

See also[edit]

References[edit]

  1. ^ "আনন্দবাজার পত্রিকা - মেদিনীপুর". archives.anandabazar.com. Retrieved 2024-04-11.
  2. ^ Singh, Shiv Sahay (2017-04-08). "In Bengal, a village and its nuclear power plans". The Hindu. ISSN 0971-751X. Retrieved 2024-04-11.
  3. ^ "Protests over nuclear land in West Bengal". www.downtoearth.org.in. Retrieved 2024-04-11.
  4. ^ "India and Russia sign civil nuclear agreement". The Hindu. 2009-12-07. ISSN 0971-751X. Retrieved 2024-04-11.
  5. ^ Monamie, Bhadra (2012-11-13). "Land-grabbing turns India's nuclear fight into a struggle for democracy". China Dialogue. Retrieved 2024-04-11.
  6. ^ "Bengal scraps Haripur nuke power project". BusinessLine. 2011-08-17. Retrieved 2024-04-11.
  7. ^ "আনন্দবাজার পত্রিকা - মেদিনীপুর". archives.anandabazar.com. Retrieved 2024-04-11.
  8. ^ "Proposal for Nuclear Power Plants in States". pib.gov.in. Retrieved 2024-04-11.