Line 19 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
Line 19
19
Overview
StatusUnder planning
LocaleShenzhen, Guangdong
Termini
Stations12 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length12.5km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 19 of the Shenzhen Metro is a line under planning, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction is planned to begin in 2023. The first phase of Line 19 has entered Phase V planning, and will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2][3] The line is proposed to use 6 car type B trains.[4]

Stations (Phase 1)[edit]

Station name Connections Location
English Chinese
Nantangwei 南塘围 Pingshan
People's Hospital 人民医院
Tang-keng 汤坑
Jinlong 锦龙 14
Xinwei 新围
Baoshan 宝山
Xinhe 新和 16
Culture Center 文化中心  Pingshan SkyShuttle Line 1 
Pingshan Center 坪山中心 14  Pingshan SkyShuttle Line 1 
Lanzhu Road 兰竹路
Lijing 荔景
Julong 聚龙

References[edit]

  1. ^ 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. ^ 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  3. ^ 深圳地铁五期规划建设13条线路 年底运营里程将破500公里. new.qq.com. 2022-09-07.
  4. ^ 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.