SmartTrack

From Wikipedia, the free encyclopedia

SmartTrack
Overview
StatusProposed
OwnerMetrolinx
LocaleToronto, Ontario
Service
TypeCommuter rail / rapid transit
Route map

Mount Dennis
St. Clair–Old Weston
Bloor
King–Liberty
Union Station
East Harbour
Danforth
Scarborough
Kennedy
Agincourt
Finch–Kennedy
Milliken

SmartTrack is a municipal proposal to enhance GO Transit rail service within Toronto, Ontario, Canada. It takes advantage of the province's existing GO Transit Regional Express Rail plans. SmartTrack has evolved since it was originally proposed by Toronto mayor John Tory as the centrepiece of his 2014 mayoral election campaign.

Originally, SmartTrack was to be a new rapid transit service with 22 stations (of which 14 would be new) along the inner portions of the Kitchener, Lakeshore East and Stouffville GO commuter train corridors. As of 2021, SmartTrack is a proposal to construct five new GO stations along the existing Kitchener, Lakeshore East, Stouffville and Barrie services.

Proposals[edit]

Original (2014)[edit]

SmartTrack was first proposed during John Tory's 2014 campaign for mayor. It had been changed with proposals made by city staff after Tory assumed office.

The SmartTrack line as originally proposed would be 53 kilometres (33 mi) long and run along Eglinton Avenue from Matheson/Airport Corporate Centre in Mississauga to Mount Dennis before turning downtown to Union Station. It would then run northeast through Scarborough to Unionville in Markham. In total, 22 stations and interchanges with the Union Pearson Express, Line 1 Yonge–University, Line 2 Bloor–Danforth, Line 5 Eglinton, and GO Transit were proposed.[1] Tory estimated ridership would be 200,000 passengers a day,[2] would cost $8 billion and be in service by 2021.[3] No costing or ridership studies had been undertaken by Metrolinx, the TTC or the City of Toronto.

On December 5 the executive committee voted unanimously to commence feasibility studies regarding the project with Toronto City Council to vote on it in January.[4] On February 10, 2015, the Toronto City Council voted to spend $1.65 million more to study SmartTrack.[5]

SmartTrack is the latest in a series of proposed solutions to provide relief for the overcrowded Yonge–University line, particularly at the Bloor–Yonge station transfer point with the Bloor–Danforth line.[6] As proposed, it would service the shoulder areas of downtown such as Liberty Village, CityPlace, and the proposed East Don Lands development.[7] It would also connect Toronto to major employment centres in Mississauga and Markham. It would run above ground north along Eglinton using the Richview Expressway right of way and along the Kitchener line, Lakeshore East line, and Stouffville line. By building above ground and using existing infrastructure Tory stated that SmartTrack would be built far faster than the Downtown Relief Line (since replaced by the proposed Ontario Line), in 7 years opposed to 17.[8]

SmartTrack would complement the Government of Ontario's plan to electrify the entire GO Transit network over the next 10 years to provide regional express rail (RER) to the Greater Toronto and Hamilton Area.[9] Using electric multiple units SmartTrack would provide all day service throughout Toronto approximately every 15 minutes. Tory claims that at Kennedy station a rider would get to Union Station in less than 30 minutes using SmartTrack’s service instead of 40 minutes along TTC's Line 2 and Line 1 subways.[1]

SmartTrack is also the latest proposal to bring rapid transit along Eglinton West to Pearson International Airport after the Eglinton West Subway was cancelled.[10] By connecting to the Eglinton line at Mount Dennis there would be rapid transportation along Eglinton from Pearson International Airport to Kennedy Road.

Tory estimated the cost of SmartTrack to be $8 billion, although no detailed studies were undertaken. As proposed by Tory, Toronto's share would be paid for by using tax increment financing. It was expected that the provincial and federal government would each contribute a third of the cost.[11] Mississauga and Markham would also pay their 1/3 share for their portions of the SmartTrack Line, although they made no commitments.

SmartTrack would likely lead to an overhaul of TTC bus routes. Residents of Etobicoke and Scarborough would take an express bus to their closest SmartTrack station instead of the distant terminuses of Line 1 and 2. By diverting these passengers SmartTrack would also benefit North York commuters on the current overcapacity feeder bus routes to the Line 1 subway.[1]

Revisions (2016–2021)[edit]

By January 2016, City and Metrolinx staff developed a draft proposal to integrate SmartTrack with expanded GO Transit rail service that would make SmartTrack smaller, cheaper and possibly more frequent. The proposal would add $2 billion to $3.5 billion to existing GO expansion plans.[12]

Under the staff proposal, SmartTrack would be shortened to run from Mount Dennis in the west to Kennedy Subway Station in the east and have only four or five new stations. Staff would replace SmartTrack's western branch along Eglinton Avenue West to Pearson Airport by an expansion of the Eglinton Crosstown LRT. There would be 6–17 LRT stops instead of three SmartTrack stops. SmartTrack's eastern branch from Kennedy Station to Markham would be deferred indefinitely.[12]

SmartTrack was to run trains every 15 minutes. However, ridership modelling showed that such a frequency would not attract a sufficient number of passengers. Thus, staff are looking at frequencies of at least every 10 minutes, and as high as every five minutes during peak periods in some areas – almost as frequent as a subway.[12]

A city staff report presented to Toronto's executive council in March 2016 says that in order to accommodate a “separate and parallel” SmartTrack service, as Tory had promised, would require two additional tracks along the entire length of the existing GO corridor necessitating the demolition of many houses and residential highrise buildings. Also, two new platforms would be required at Union Station. This would not be possible to implement within seven years and for $8 billion. Instead of the 22 new stops promised by Tory, staff are proposing only four to eight additional stops. As of March 2016, the issues of fare, frequency of trains and total cost are unresolved.[13]

By June 2016, City planning staff were recommending seven new stations for SmartTrack service in addition to combined SmartTrack/GO RER service at Union Station, one future GO station (Mount Dennis) plus six existing GO stations. The six new SmartTrack stations would be St. Clair–Old Weston, King–Liberty (Liberty Village at King Street), East Harbour (Unilever site), Gerrard–Carlaw, Lawrence–Kennedy, and Finch–Kennedy. A proposed SmartTrack station near Ellesmere SRT station was cancelled.[14] Another proposed station between Liberty Village and Union Station was considered but was rejected as it would not fit with the track density at that location. Staff had estimated that SmartTrack would put 24,100 residents and 19,000 jobs within 500 metres of a station, and would carry 27,600 riders daily in addition to GO Regional Express Rail, and would divert 3,900 riders from the Yonge subway south of Bloor Street during the morning rush hours.[15]

Metrolinx estimated that the six new SmartTrack stations would cost $1.25 billion, of which the City would pay $835 million, with the federal government paying the balance. Approvals for the financing were still to be secured as of November 3, 2016.[16] Separately, the province was to spend $3.7 billion on GO Regional Express Rail which is a prerequisite for SmartTrack. Completion is expected by 2026.[17]

In September 2018, the Ontario Ministry of the Environment approved the environmental assessment for the 6 new SmartTrack stations.[18]

By January 2021, the number of new SmartTrack stations had been further reduced from six to four. The proposed Lawrence–Kennedy and Gerrard–Carlaw stations were dropped due to their proximity to new proposed subway lines, respectively the Scarborough Subway Extension and the Ontario Line. The four new stations remaining under consideration were Finch–Kennedy, King–Liberty (Liberty Village at King Street), St. Clair–Old Weston and Bloor–Lansdowne, the latter of which is on the Barrie line rather than the SmartTrack corridor.[19]

On August 17, 2021, the province and the City of Toronto signed an agreement in principle to provide five new GO stations to support SmartTrack. One station, Bloor–Lansdowne, is classified as a SmartTrack station even though it will not be on the originally conceived SmartTrack corridor. The new stations will be jointly funded by the City of Toronto, the Province of Ontario and the federal government.[20]

Current[edit]

As of August 2021, the "SmartTrack Stations program" is a plan to construct five new railway stations that will serve existing GO Transit rail lines. Four of the stations (Finch–Kennedy, East Harbour, King–Liberty, and St. Clair–Old Weston) were part of the original SmartTrack proposal while the fifth (Bloor–Lansdowne) was not along the SmartTrack corridor. All five stations are expected to open by 2026.[20]

The SmartTrack stations are in addition to four other proposed new GO stations (Park Lawn, Spadina–Front, Woodbine and Caledonia) that are not part of SmartTrack. Another original SmartTrack station, Mount Dennis, is under construction.

As of March 2023, the costs to deliver the five SmartTrack stations was confirmed by city staff to have increased to $1.697 billion, an increase of $234 million from the original $1.463-billion budget, due to supply chain pressures and increases in contractor bids from initial cost estimates.[21] City staff requested the city council seek the province’s financial commitment to cover the cost increases. City staff also provided a program update which advised that the entirety of the SmartTrack program will enter revenue service by March 2029. On June 14, 2023, the Deputy Mayor advised the council that negotiations led to the province providing a funding subsidy such that the revised program budget was now $1.689 billion, with $878 million from the City of Toronto, $585 million from the Government of Canada, and $226 million from the Province of Ontario.[22] The difference in program budgets between March and June 2023 is due to a reduction in the project contingency amount. The city's financial contribution is being provided through the city's building fund, tax increment financing and development charges. The province's financial commitment was conditional upon a number of terms, some of which stated that the original program budget must be fully utilized before tapping into the province's funding and that the city and province will manage the revised program budget by implementing cost mitigation measures as required (e.g. value engineering, de-scoping, along with station-specific and program contingencies) to keep the SmartTrack Program on time and on budget.

Anticipated economic benefits[edit]

There has been an ongoing discussion as to economic benefits of Toronto's different rapid transit choices.[23] According to Tess Kalinowski, writing in the Toronto Star, a study co-authored by Andre Sorensen, a University of Toronto professor of Human Geography, SmartTrack's route would average 12 hectares per kilometre available for redevelopment. This was slightly more than the 11.1 hectares per kilometre available if the TTC's heavy rail system were extended from Kennedy station to Sheppard Avenue.

Outstanding issues and criticism[edit]

As of October 2017, proposed layouts for each new SmartTrack station were available for public review. However, the following issues remained outstanding:[24]

  • The projected ridership is not yet known.
  • The passenger fare for SmartTrack has yet to be determined and may depend on the outcome of a Metrolinx study on regional fare integration.
  • The train frequency is not yet finalized. The hoped-for frequency is 6–10 minutes in rush hours and 15 minutes in the off-hours.
  • It is uncertain whether there would be direct trains between the east and west ends of the SmartTrack route, or a change of train at Union Station. A change of trains might reduce ridership.

A controversial part of Tory’s SmartTrack proposal during the election campaign was the Eglinton spur, from Mount Dennis to the Airport Corporate Centre in Mississauga. During the election campaign, Tory promised it would not require tunnelling, then acknowledged under pressure that it might. (Tory and his campaign staff had planned to use the former Richview Expressway corridor to run commuter trains westwards from Mount Dennis. However, that land was no longer available having been sold off for private development. Also the Tory team underestimated the technical difficulties of the large turning circle that heavy rail vehicles would require at Mount Dennis. This forced the need for much more expensive tunnel and elevated sections.)[25][26][27] City Manager Pennachetti said the city would study the “technical feasibility, community impacts, and cost implications of a heavy rail line” on the Eglinton spur, including the “feasibility of any required tunnels and bridges.”[28] According to a joint report from city planners and the University of Toronto Transportation Research Institute released in January 2016, heavy rail would draw about 87,000 daily boardings at a cost up to $7.7 billion while LRT would draw more than 105,000 daily transit boardings at a cost of about $1.3 billion. On January 19, 2016, Mayor John Tory conceded that heavy rail was not the best option for the branch from Mount Dennis to the airport.[29]

The eastern sections of SmartTrack will run on the tracks of the Stouffville GO line, and would therefore be within two kilometres of the proposed extension of the Line 2 Bloor–Danforth subway into Scarborough. There was concern that SmartTrack trains would cannibalize the subway's ridership.[30] A report, titled Choices for Scarborough, Transit, Walking and Intensification in Toronto’s Inner Suburbs written by University of Toronto professors Andre Sorensen and Paul Hess, states that the worst-case scenario would be to build the Scarborough Subway Extension on the city’s approved route along McCowan Road within two kilometres of SmartTrack.[23] By October 2015, TTC CEO Andy Byford also expressed concern that two lines may cannibalize each other’s riders.[31] On January 20, 2016, City Staff issued a proposal to eliminate two of the three stops on the planned Scarborough Subway Extension and to terminate Line 2 Bloor–Danforth at Scarborough Town Centre with no intermediate stops from Kennedy station. Critics claim this revised plan would prevent the subway from cannibalizing ridership from SmartTrack's branch to Markham.[32]

Critics described Tory's pledge to pay the city’s portion of SmartTrack costs solely through tax increment financing as overly risky prompting the city and provincial officials to study the financial risks.[28] In October 2015, a city staff report said TIFs “may be an appropriate revenue tool,” but there is a risk new development won’t happen as expected, and that directly attributing any new development to the transit line may be a challenge.[31] Globe & Mail columnist Marcus Gee cited an example of TIF risk for transit projects: as of 2012, TIF has not been successful in New York City to help pay for a $2.4-billion extension of the 7 subway line, as TIF revenue from new development had fallen more than $100 million short of the $283 million expected.[33] In October 2016, a City report said that TIF would be insufficient to fund the City's portion of SmartTrack implementation costs. The report said that to "fund the early shortfalls", a 2.1% property tax increase would also be required until 2026.[34]

During the 2014 mayoral election, John Tory's election team predicted SmartTrack would carry 200,000 passengers per day with trains operating at a 15-minute frequency with a TTC fare being charged. According to University of Toronto academics, if the service runs every five minutes and uses TTC fares, SmartTrack could carry up to 300,000 people per day. However at a frequency of every 15 minutes (as proposed by John Tory), ridership would fall to about 75,000 people per day with a TTC fare, or half that with a GO fare.[35]

In October 2015, the mayor's office issued a statement believing a staff report confirms "that SmartTrack will provide real relief on the Yonge subway line with 75 existing TTC bus and streetcar routes connecting into the SmartTrack line.” However, transit blogger Steve Munro countered that the study does not confirm that SmartTrack would relieve crowding on the Yonge-University line as ridership projections were still unavailable to form such a conclusion.[31]

In an October 6, 2015, letter to Toronto's city manager, Metrolinx CEO Bruce McCuaig wrote "Metrolinx and the province believe that the (city report) should reflect the scenario where SmartTrack is an incremental increase in RER (regional express rail) service, rather than an independent and parallel service that co-exists with RER." The letter also says SmartTrack cannot operate as a "surface subway" as federal rail regulations would prohibit TTC-style subway trains from operating on GO's mainline-rail tracks. The letter also warns that SmartTrack could entail "considerable" expense over and above the GO plans for RER, "depending on the service concept and design."[36]

During the 2014 election, John Tory said that SmartTrack could be completed within 7 years. An October 2016 city report suggests that SmartTrack would not be completed until 2024[37] or 2026,[38][34] depending on various interpretations.

By late 2017, approval of the new Lawrence East SmartTrack station was in doubt pending a cost/benefit review by the provincial auditor general. There was a concern of political pressure in the decision for this station.[24] There was also the issue of whether the right of way is wide enough to permit construction of the SmartTrack station without shutting down Line 3 Scarborough which also has a station at that location.[39] In January 2021, the Lawrence–Kennedy station was dropped because its proximity to the proposed Scarborough Subway Extension.[19]

Given that the number of proposed new SmartTrack stations had been reduced from 22 to 4 by January 2021, city councillor Gord Perks suggested that SmartTrack be abandoned and that the $1.46 billion the City had budgeted for SmartTrack be allocated to improving TTC services.[19]

SmartTrack stations[edit]

The following table lists SmartTrack stations, both currently proposed and cancelled, along the Kitchener, Lakeshore East and Stouffville GO Transit rail corridors. It excludes Bloor–Lansdowne station on the Barrie corridor as it was not originally conceived as a SmartTrack station.

Stop Details Transit connections Comments
Matheson Airport Corporate Centre MiWay 7 Airport, 43 Matheson–Argentia and 107 Malton Express bus routes This section was cancelled and is to be replaced by a westerly extension of Line 5 Eglinton[29]
Kipling TTC 45 Kipling and 32 Eglinton West bus routes
Scarlett or Jane TTC 35 Jane, 73 Royal York, 32 Eglinton West bus routes
Mount Dennis Kitchener line; Union Pearson Express; Line 5 Eglinton Future station for SmartTrack and GO trains
St. Clair–Old Weston Approx. 4 kilometres (2.5 mi) west of St. Clair West subway station, between Keele St. / Weston Rd. and Old Weston Rd. 512 St. Clair streetcar route New proposed SmartTrack station
Bloor GO Station Kitchener line; Union Pearson Express; Line 2 Bloor–Danforth; 504 King and 505 Dundas streetcar routes
King–Liberty Liberty Village at King Street 504 King streetcar route New proposed SmartTrack station
Spadina–Front 510 Spadina streetcar route Not recommended by city staff[15]
Union Station Line 1 Yonge–University; GO Transit; Via Rail; Union Pearson Express; 509 Harbourfront and 510 Spadina streetcar routes
East Harbour Unilever site south of Eastern Avenue sold by Unilever Canada to First Gulf Corporation Connection to proposed Ontario Line Proposed station for GO Transit trains and Ontario Line
Queen/Riverdale 501 Queen streetcar route Not recommended by city staff[15]
Gerrard–Carlaw At Gerrard Street and Carlaw Avenue 506 Carlton streetcar route Proposed SmartTrack station cancelled due to proximity to Ontario Line[19]
Danforth GO Station Line 2 Bloor–Danforth; Lakeshore East line; 506 Carlton
Scarborough GO Station Lakeshore East line
Kennedy GO Station Line 2 Bloor–Danforth; Line 5 Eglinton; Stouffville line
Lawrence–Kennedy Beside Lawrence East station TTC 54 Lawrence East bus route Proposed SmartTrack station cancelled due to proximity to the Line 2 Scarborough extension[19]
Ellesmere Beside Ellesmere station TTC 95 York Mills bus route Proposed SmartTrack station cancelled[14]
Agincourt GO Station Northside of Sheppard Avenue East west of Agincourt Drive Stouffville line
Finch–Kennedy between Midland Avenue and Milliken Boulevard TTC 39 Finch East bus New proposed SmartTrack station
Milliken GO Station Side of Steeles Avenue East with access via Redlea Avenue Stouffville line
14th Avenue West of Kennedy Road York Region Transit 2 Milliken bus route Not recommended by city staff[15]
Unionville GO Station At YMCA Boulevard west of Kennedy Road (Downtown Markham) Stouffville line To be an RER station[40] but not a SmartTrack station[41][24]

References[edit]

  1. ^ a b c One Toronto Transit (May 27, 2014). "The SmartTrack Line" (PDF). John Tory for Mayor. Archived from the original (PDF) on July 15, 2014. Retrieved August 12, 2014.
  2. ^ Cross, Jessica Smith (May 27, 2014). "John Tory unveils 'One Toronto' transit plan with SmartTrack centrepiece". Metro News. Retrieved August 12, 2014.
  3. ^ Kay, Jonathan (May 28, 2014). "Jonathan Kay: Could a Mayor John Tory build SmartTrack and save Toronto?". National Post. Archived from the original on December 8, 2014. Retrieved August 12, 2014.
  4. ^ Nickle, David (December 5, 2014). "Mayor Tory's executive committee asks for feasibility reports on SmartTrack". York Guardian. Retrieved December 8, 2014.
  5. ^ Pagliaro, Jennifer (February 10, 2015). "Council approves $1.65 million more to study Mayor John Tory's SmartTrack". Toronto Star. Retrieved March 1, 2015.
  6. ^ James, Royson (May 29, 2014). "Don't hold your breath for that downtown relief line: James". Toronto Star. Retrieved August 12, 2014.
  7. ^ Hui, Ann (May 15, 2014). "Mayoral candidate John Tory promotes new business district in East Don Lands". The Globe and Mail. Retrieved August 12, 2014.
  8. ^ James, Royson (May 28, 2014). "John Tory complicates transit debate with a simply good idea: James". Toronto Star. Retrieved August 12, 2014.
  9. ^ Munro, Steve; Dotan, Hamutal (July 23, 2014). "Transportation Minister Steven Del Duca: It's Time for Building, Not Planning". Torontoist. Retrieved August 12, 2014.
  10. ^ Kalinowski, Tess (April 5, 2013). "Crosstown LRT: Eglinton's big dig ends 30-year wait for renewal". Toronto Star. Retrieved August 12, 2014.
  11. ^ Gupta, Rahul (May 27, 2013). "Tory transit plan proposes SmartTrack trains to run on GO lines". York Guardian. Retrieved August 12, 2014.
  12. ^ a b c Moore, Oliver (January 14, 2016). "John Tory's SmartTrack transit plan for Toronto getting smaller, cheaper". The Globe and Mail. Retrieved January 15, 2016.
  13. ^ Pagliaro, Jennifer (March 8, 2016). "The undoing of Mayor John Tory's transit promises: Analysis". Toronto Star. Retrieved March 8, 2016.
  14. ^ a b Spurr, Ben (June 21, 2016). "John Tory's SmartTrack going ahead with six new stops". Toronto Star. Retrieved June 25, 2016.
  15. ^ a b c d Spurr, Ben (June 2, 2016). "Version of SmartTrack taking shape with seven new stations". Toronto Star. Retrieved June 2, 2016.
  16. ^ Keenan, Edward (November 3, 2016). "We'll know soon if Tory's transit promises are for real: Keenan". Toronto Star. Retrieved November 3, 2016.
  17. ^ Spurr, Ben; Pagliaro, Jennifer (June 26, 2016). "Mayor John Tory's transit priorities face financial, political challenge: analysis". Toronto Star. Retrieved July 20, 2016.
  18. ^ "Ontario government approves Toronto's new SmartTrack stations". CBC. Retrieved October 3, 2018.
  19. ^ a b c d e Spurr, Ben (January 20, 2021). "Mayor John Tory's SmartTrack plan loses another two stations". Toronto Star. Retrieved January 21, 2021.
  20. ^ a b "New agreement with City of Toronto helps bring new SmartTrack stations closer to reality". Metrolinx. August 17, 2021. Archived from the original on August 18, 2021. Retrieved August 18, 2021.
  21. ^ "Agenda Item History". toronto.ca. Retrieved April 19, 2023.
  22. ^ "Agenda Item History". toronto.ca. Retrieved June 14, 2023.
  23. ^ a b Kalinowksi, Tess (March 11, 2015). "Scarborough LRT would attract more development than subway: Study". Toronto Star. Archived from the original on March 12, 2015. The study looked at the prospects for redevelopment along LRT routes on Eglinton-Morningside and Malvern, as well as Sheppard. Combined, they had 18.4 hectares per kilometre that could be available for redevelopment. That was more than the 12 hectares per kilometre on SmartTrack and 11.1 hectares per kilometre on the McCowan subway route, which is supposed to replace the aging Scarborough RT.
  24. ^ a b c Spurr, Ben (October 10, 2017). "Tory's Smarttrack plan heads off for public input". Toronto Star. Retrieved October 11, 2017.
  25. ^ Kalinowski, Tess (August 26, 2014). "Is John Tory's SmartTrack on track for seven-year delivery?". Toronto Star. It gets snarled in development at the Weston end of the tract, but Tory's campaign says that's not an issue. A tunnel or elevated section of the line would solve the problem — possibly just a trench such as the one the Yonge subway runs in north of Bloor St.
  26. ^ Salerno, Rob (September 9, 2014). "Is John Tory's SmartTrack able to leap tall buildings?". Now. Retrieved January 10, 2016. A 10-kilometre stretch set aside for his surface rail plan along Eglinton West has already been blocked by condo and townhouse development
  27. ^ Moore, Oliver (November 17, 2015). "Western spur estimates raise doubt over feasibility of Tory's SmartTrack". The Globe and Mail. Retrieved January 10, 2016. The figure raises new questions about the viability of doing the entire project for the $8-billion Mr. Tory promised during the mayoral campaign. And it is likely to re-energize debate about whether the area would be better served by a previously proposed light-rail line costing billions of dollars less.
  28. ^ a b Dale, Daniel (January 16, 2015). "SmartTrack studies to cost another $1.65 million". Toronto Star. Retrieved October 19, 2015.
  29. ^ a b Rider, David (January 19, 2016). "SmartTrack still on track despite changing plan, Mayor Tory says". Toronto Star. Retrieved January 19, 2016.
  30. ^ Kalinowski, Tess (January 29, 2015). "Scarborough subway plans complicated by SmartTrack proximity". Toronto Star. Retrieved January 29, 2015.
  31. ^ a b c Kalinowski, Tess (October 15, 2015). "Mayor John Tory's SmartTrack plan faces big hurdles in the west". Toronto Star. Retrieved October 19, 2015.
  32. ^ Pagliaro, Jennifer (January 20, 2016). "New Scarborough transit plan 'buys peace in the land'". Toronto Star. Retrieved January 20, 2016.
  33. ^ Gee, Marcus (August 23, 2014). "John Tory's SmartTrack: Why his big bet on transit is a real risk". The Globe and Mail. Retrieved October 20, 2015.
  34. ^ a b Moore, Oliver (October 31, 2016). "Tory's Smart Track plan can't be funded, built as promised: report". The Globe and Mail. Retrieved October 31, 2016.
  35. ^ Moore, Oliver (January 19, 2016). "Tory admits parts of his SmartTrack plan will not work". The Globe and Mail. Retrieved January 19, 2016.
  36. ^ Kalinowski, Tess (October 17, 2015). "GO and Smarttrack are one and the same service, says Metrolinx". Toronto Star. Retrieved October 19, 2015.
  37. ^ Spurr, Ben; Pagliaro, Jennifer (October 31, 2016). "Report outlines steep costs of running new Toronto transit lines". Toronto Star. Retrieved October 31, 2016.
  38. ^ Jeffords, Shawn (October 31, 2016). "Property tax hike to pay for Smart Track?". Toronto Sun. Retrieved November 1, 2016.
  39. ^ Pagliaro, Jennifer (November 21, 2017). "City staff recommend moving ahead on SmartTrack stations despite financing uncertainty". Toronto Star. Retrieved November 22, 2017.
  40. ^ "Stouffville GO line". Metrolinx. Retrieved October 12, 2017.
  41. ^ "New SmartTrack/GO Stations – Media Briefing" (PDF). City of Toronto. October 10, 2017. p. 4. Retrieved October 11, 2017.

External links[edit]

smarttrack.to (archived February 29, 2020)