Talk:Interstate 705/GA1
GA Review[edit]
GA toolbox |
---|
Reviewing |
Article (edit | visual edit | history) · Article talk (edit | history) · Watch
Reviewer: Racepacket (talk) 23:04, 23 January 2011 (UTC)
No disamb. links. External links check out.
- It is reasonably well written.
- a (prose): b (MoS for lead, layout, word choice, fiction, and lists):
- Change "the University of Washington at Tacoma campus" to "the University of Washington Tacoma campus"
- Perhaps change "The Bridge of Glass passes over I-705 as it continues north" to "The Bridge of Glass, which , links the Museum of Glass on the shorefront to downtown Tacoma, passes over I-705 as it continues north"
- "Traffic coming from Bates Technical College and South 13th Street join in" - avoid ending with a preposition
- a (prose): b (MoS for lead, layout, word choice, fiction, and lists):
- It is factually accurate and verifiable.
- a (references): b (citations to reliable sources): c (OR):
- a (references): b (citations to reliable sources): c (OR):
- It is broad in its coverage.
- a (major aspects): b (focused):
- To what extent was the construction of I-705 delayed by the environmental litigation in WSDOT v. EPA http://ftp.resource.org/courts.gov/c/F2/917/917.F2d.1309.89-1445.html?
- Are there any future plans for construction or seismic upgrades?
- Thank you for the average traffic. Do you have any sense of traffic on days when there are events at the Tacoma Dome?
- a (major aspects): b (focused):
- It follows the neutral point of view policy.
- Fair representation without bias:
- Fair representation without bias:
- It is stable.
- No edit wars, etc.:
- No edit wars, etc.:
- It is illustrated by images, where possible and appropriate.
- a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
- a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
- Overall:
- Pass/Fail:
- I am placing the article on hold. Racepacket (talk) 23:42, 23 January 2011 (UTC)
- Pass/Fail:
- In terms of a complete history, this page has a photo of the construction of a new I-5 collector lane with the caption "When complete, the I-5 South 48th Street to Pacific Avenue project will provide a new multi-lane, northbound collector/distributor road which will include a new northbound exit to I-705, and an improved merge from SR 16." It is dated September 30, 2006.
- http://www.wsdot.wa.gov/Projects/PierceCountyHOV/stagelist.htm says the bridge of I-705/SR 7 is being replaced to allow for additional HOV lanes on i-5 is "currently in design."
- This page says that they would shut down the I-705 for a weekend to demolish the old bridge. (dated March 29, 2002)
Congratulations. Racepacket (talk) 12:56, 24 January 2011 (UTC)