Jump to content

Talk:SODO station (Sound Transit)/GA1

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

GA Review[edit]

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: Dough4872 (talk · contribs) 20:31, 3 January 2015 (UTC)[reply]

GA review (see here for criteria)

  1. It is reasonably well written.
    a (prose): b (MoS):
    The sentence "Light rail testing on the 1.3-mile-long (2.1 km), at-grade SoDo segment began in March 2007,[23] and ended in February 2008,[24] allowing for regular Link service to begin on July 18, 2009" should be split so that the testing and opening are in different sentences.
     Split
  2. It is factually accurate and verifiable.
    a (references): b (citations to reliable sources): c (OR):
  3. It is broad in its coverage.
    a (major aspects): b (focused):
    • "A groundbreaking ceremony for Central Link was held at SODO Station in November 2003, with construction on the "easiest part of the project" beginning shortly thereafter.", why was this the easiest part of the project? Should clarify.
      • I've removed the statement, as I originally thought it was a quote from a Sound Transit spokesman.
    • What are the service headways on weekends? The article seems to only mention the headways for weekday service.
      •  Added, along with the service sections for the other Link station GAs.
  4. It follows the neutral point of view policy.
    Fair representation without bias:
  5. It is stable.
    No edit wars, etc.:
  6. It is illustrated by images, where possible and appropriate.
    a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
  7. Overall:
    Pass/Fail:

I will place the article on hold for a few issues to be addressed. Dough4872 01:53, 4 January 2015 (UTC)[reply]

And they've been addressed. SounderBruce 04:03, 4 January 2015 (UTC)[reply]
I will now pass the article. Dough4872 04:05, 4 January 2015 (UTC)[reply]