User:ToolWiki23/Kemayoran Airport Plan

From Wikipedia, the free encyclopedia
User:ToolWiki23 User talk:ToolWiki23 User:ToolWiki23/News User:ToolWiki23/Image User:ToolWiki23/header User:ToolWiki23/List Sandbox User:ToolWiki23/Userboxes Special:Contributions/ToolWiki23 User:ToolWiki23/Car User:ToolWiki23/Editnotice User:ToolWiki23/style User:ToolWiki23/List toll road in Indonesia
Userpage Talk channel News My image header My sandbox Userboxes My edit Car Editnotice Wdefcons Toll road
Phase Year Description Status
Phase 1 1928 Opening of terminal domestic with a capacity 300 thousands passengers per annum. Completed
Phase 2 1940 Refurbishment of terminal domestic increase with a capacity 600 thousands passengers per annum. Completed
Phase 3 1960 Refurbishment of terminal domestic increase with a capacity 1 million passengers per annum. Completed
Phase 3 1970 construction two runways. Not Fixed (it was demolished early 1985).