Jump to content

Adria–Wien Pipeline

From Wikipedia, the free encyclopedia
Adria–Wien Pipeline
Location
CountryAustria
General directionwest-east
FromTransalpine Pipeline, Würmlach
ToSchwechat Refinery
General information
Typeoil
PartnersOMV, BP Austria, Shell Austria, Esso Austria, Agip
OperatorAdria-Wien Pipeline GmbH
Commissioned1970
Technical information
Length420 km (260 mi)
Maximum discharge8 million tons per year

The Adria–Wien Pipeline (AWP) is a crude oil pipeline, which connects the Transalpine Pipeline from Würmlach at the Italian-Austrian border with the Schwechat Refinery near Vienna, Austria. It allows oil supplies to Austria from the Italian oil terminal in Trieste.[1]

History

[edit]

The planning of the pipeline started in 1965 with establishment of Adria–Wien Pipeline GmbH. The construction started in 1969 and the pipeline was commissioned in 1970.

Technical features

[edit]

The length of the pipeline is 420 kilometres (260 mi). It has also a 14 kilometres (8.7 mi) long branch line to Lannach. The diameter of the main pipeline is 18 inches (460 mm) and it consists of 12 pumping stations. The capacity of the pipeline is 8 million tons of crude oil per year.[2]

Operating company

[edit]

The pipeline is operated by Adria–Wien Pipeline GmbH, in which OMV owns 76%.[1] Other shareholders are BP Austria, Shell Austria, Esso Austria and Agip.

References

[edit]
  1. ^ a b "OMV Pipelines Ensure Energy Supply" (PDF). OMV. Retrieved 2008-12-07.
  2. ^ "AWP - Adria Wien Pipeline: Technische Daten". Archived from the original on 2016-03-03. Retrieved 2013-04-04.
[edit]