Draft:Kolkata metro line 6

From Wikipedia, the free encyclopedia


Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro, in the Indian state of West Bengal, is a rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. It currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This stretch will be one of the most important stretches of the metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. The total distance of this route will be 29.87 km (18.56 mi).[1]

The trials of the 5.4 km (3.4 mi) Kavi Subhas-Hemanta Mukhopadhyay station at Ruby crossing segment was covered in eight minutes without stoppages. The speed trials for the East-West Metro during the CRS inspection in 2019 had been at 80 km/h (50 mph).[2] It connects Line 1 at Kavi Subhash and will eventually connect Lines 2 and 4.


Kolkata Metro Line 6

Biman Bandar - Kavi Subhash
Overview
Other name(s)
  • New Town metro
  • Airport Metro
  • Bypass Metro
StatusOperational
OwnerMetro Railway, Kolkata
Line number6
LocaleKolkata metropolitan area, India
Termini
Connecting linesBlue Line Green Line Yellow Line
Stations24
Websitemtp.indianrailways.gov.in
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)
  • NSCBI Airport (under construction)
  • New Garia
  • New Town (under construction)
Rolling stock3
Daily ridership500,000 (projected)
History
Opened6 March 2024; 56 days ago (2024-03-06)
Last extension6 March 2024; 56 days ago (2024-03-06)
Technical
Line length29.87 kilometres (18.56 mi)[1]
5.4 kilometres (3.4 mi)(Operational)[3]
Number of tracks2
Character
  • Surface – 1
  • Underground – 1
  • Elevated – 22
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC[4] using third rail
Operating speed80 km/h (designed)
SignallingCommunications-based train control
Route map

Kavi Subhash
Satyajit Ray
Jyotirindra Nandi
Panchanangram Canal
Kavi Sukanta
Hemanta Mukhopadhyay
VIP Bazar
Ritwik Ghatak
Storm Water Outlet Canal
Barun Sengupta
Beleghata
Captain Bhery
Gour Kishore Ghosh
Nalban
IT Centre
Nabadiganta
Keshtopur Canal
Nazrul Tirtha Bus interchange
Swapnabhor
Biswa Bangla Convention Centre
Keshtopur Canal
Shiksha Tirtha
Mother's Wax Museum
Eco Park
Mangaldeep
City Centre-2
Chinar Park
VIP Road Bus interchange Green Line
Jai Hind

References[edit]

  1. ^ a b "New System Map of Kolkata Metro".
  2. ^ "Ruby-New Garia trial clocks 83kmph speed". The Times of India. 22 January 2023.
  3. ^ "In addition to the underwater metro, the Prime Minister will also inaugurate the Kavi Subhash - Hemanta Mukhopadhyay Metro section".
  4. ^ "CAF to supply Kolkata metro trains".