Gasmeth Energy Gas Works

Coordinates: 01°42′33″S 29°14′53″E / 1.70917°S 29.24806°E / -1.70917; 29.24806
From Wikipedia, the free encyclopedia

Gasmeth Energy Gas Works
Gasmeth Energy Gas Works is located in Rwanda
Gasmeth Energy Gas Works
Location of Gasmeth Energy Gas Works
CountryRwanda
ProvinceLake Kivu, Rubavu District, Rwanda
CityGisenyi
Coordinates01°42′33″S 29°14′53″E / 1.70917°S 29.24806°E / -1.70917; 29.24806
Refinery details
Commissioned2021 (Expected)

The Gasmeth Energy Gas Works (GEGW) is a planned methane gas extraction and processing plant in Rwanda.[1]

Location[edit]

The plant would be located on the waters of Lake Kivu, in Rwandan territory, within the vicinity of the city of Gisenyi, approximately 165 kilometres (103 mi), by road, north-west of Kigali, Rwanda's capital and largest city.[2]

Overview[edit]

Lake Kivu is reported to contain a considerable amount of methane gas and carbon dioxide, which, when they bubble to the surface, form lethal "toxic clouds". However, when the gases are extracted and canned (bottled), they form vital cooking fuel which replaces scarce firewood and charcoal, thereby preserving the environment. Previous projects have directed the gas towards generation of electricity.[3]

In January 2019, Rwanda's cabinet authorized Rwanda Development Board to enter into a concession with Gasmeth Energy Limited, to extract methane gas for domestic and industrial use as a cooking fuel.[4] On 5 February 2019, agreements were signed, between the Rwanda Development Board (RDB), the Rwanda Mines, Petroleum and Gas Board (RMB) and Gasmeth Energy Limited (GEL), committing GEL to construct a facility on Lake Kivu to extract, process and compress methane gas for the domestic and export market. This is the first major project in the African Great Lakes region for the extraction of methane gas for cooking, on an industrial scale.[5]

Gasmeth Energy Limited[edit]

The owner-developers of this project are Gasmeth Energy Limited, a Rwanda-registered company, whose shareholders are as illustrated in the table below.[1]

Gasmeth Energy Limited Stock Ownership
Rank Name of Owner Percentage Ownership
1 American Investors
2 Nigerian Investors
3 Rwandan Investors
Total 100.00

Construction and funding[edit]

Gasmeth has committed in writing to invest US$400 million into the construction of the methane gas plant.[1][5] It is expected that commercial operation of the new plant will begin by February 2021.[1]

See also[edit]

References[edit]

  1. ^ a b c d Clement Uwiringiyimana (5 February 2019). "Rwanda signs $400 million deal to produce methane gas from "Killer Lake"". Reuters Africa. Retrieved 7 February 2019.[dead link]
  2. ^ Globefeed.com (5 February 2019). "Distance between Kigali, Nyarugeng, Umujyi Wa Kigali, RWA and Gisenyi, Western Province, RWA". Globefeed.com. Retrieved 5 February 2019.
  3. ^ Times Reporter (25 May 2008). "Why Rwanda will do everything to extract Lake Kivu's methane gas". New Times (Rwanda)]. Kigali. Retrieved 7 February 2019.
  4. ^ Julius Bizimungu (29 January 2019). "New firm gets concession to extract methane gas from Lake Kivu". New Times (Rwanda). Kigali. Retrieved 7 February 2019.
  5. ^ a b Collins Mwai (5 February 2019). "Gasmeth Energy to invest $400m in Kivu methane extraction". New Times (Rwanda). Kigali. Retrieved 7 February 2019.

External links[edit]