H series (Toronto subway)
H series | |
---|---|
In service |
|
Manufacturer |
|
Built at |
|
Replaced | G series |
Constructed | |
Entered service |
|
Scrapped |
|
Number built |
|
Number scrapped |
|
Successor |
|
Fleet numbers |
|
Capacity | 76 seated |
Operators |
|
Depots | Greenwood, Davisville |
Lines served |
|
Specifications | |
Car body construction | Aluminum |
Car length | 22.86 m (75 ft 0 in) |
Width | 3.14 m (10 ft 4 in) |
Height | 3.65 m (12 ft 0 in) |
Floor height | 1.1 m (3 ft 7 in) |
Doors | 8 sets (4 sets per side) per car |
Maximum speed | 88 km/h (55 mph) |
Weight |
|
Power output |
|
Auxiliaries | 120/208 V AC Battery Auxiliary |
Electric system(s) | Third rail; |
Current collector(s) | Contact shoe |
Track gauge |
|
The H series is the third series of rapid transit rolling stock used in the subway system of Toronto, Ontario, Canada. They were built in six production sets, named H-1 to H-6, from 1965 to 1990 in Thunder Bay, Ontario, for the Toronto Transit Commission (TTC). The entire rolling stock was retired in 2014, though thirteen remaining cars still exist as work cars, including three H-1 cars.
The first five sets were manufactured by Hawker Siddeley Canada until 1979, when the company was purchased by the Urban Transportation Development Corporation (UTDC), which then took over production. They operated alongside their predecessor models, the M series, while the H-6 trains replaced the last remaining G-series trains in 1990.
All H-series cars were manufactured in a facility Hawker Siddeley inherited from Canadian Car & Foundry, which had earlier produced PCC streetcars for the TTC's streetcar network. The facility was taken over by Bombardier Transportation in 1991, which has continued to produce all subsequent rolling stock for the subway. They include the successor of the H series, the T series, introduced in 1996 and which replaced earlier H-series (H-1, H-2, and the prototype H-3) trains by 1999. The remaining H-4, H-5, and H-6 trains were replaced between 2011 and 2014 by the newest model, the Toronto Rocket.
History
[edit]Based on the 75 ft (22.86 m) M1, the early H-series cars improved on the design, notably by enlarging the operator's cab and using a single-handle controller.[2] Revisions were made to the designs, and each production model in the H series improved on the last. The H-5s were the first subway cars in the TTC fleet to use chopper controls and were also the first cars with regenerative braking and air-conditioning systems. They had a brighter and more modern passenger interior. Black vinyl seats were replaced by red fabric seats. Individual seats replaced the padded bench seats used on previous models. The interior colour scheme consisted of red floors, cream walls, yellow doors and panels, and brown simulated wood grain panels. The H-6s replaced the original red G-class cars and were used almost exclusively on the Bloor-Danforth line,[3] with no further H-series orders made. The H-6s were similar to the H-5s, but had light brown floors, and orange doors and panels. A prototype T-series car was built by UTDC in 1990–1991, and evaluated by the TTC. By the time the TTC was ready to order new cars in 1992, UTDC had been sold to Bombardier. Bombardier added new technology such as AC propulsion to a platform based on the predecessor H-series cars.
48 cars based on the H-1 model were built and used for the Expo Express in Montreal, for Expo 67. 108 modified H-6 cars were produced for the Ankara Metro by Bombardier from 1996 to 1997.
Retirement and future
[edit]The H-1 and H-2 cars were replaced by the T1-class cars. The last 12 remaining H-1 cars were retired on November 29, 1999. All of the H-2 cars were retired by September 28, 2001. Nearly all H-1 and H-2 cars were scrapped, although a very small amount of H-1 cars are used as subway work vehicles. Some H-4 cars were retired when T1-series cars were delivered.
In 2006, the TTC placed an order with Bombardier Transportation for the first 39 articulated Toronto Rocket (TR) trains to be operated on the Yonge–University-Spadina (YUS) line. This allowed the TTC to retire the remaining H-4 and H-5 cars.[4][5]
A contract option was exercised in 2010, when the TTC ordered 31 additional new TR trains making 70 trains in total. This allowed for the retirement of the H-6 subway cars on the Bloor–Danforth line and to have enough new TR trains available for the opening of the YUS line extension to Vaughan.[6]
With the arrival of the articulated TR trains in 2011, many T1-series trains were transferred from the YUS line to the Bloor–Danforth line. This allowed for the retirement of the H-4 cars, between the fall of 2011 until January 27, 2012, when the last H-4 train made its last run during the morning rush on the Bloor-Danforth line.[7] The H-4s were expected to be scrapped at Future Enterprises in Hamilton, Ontario, although some H-4 cars were retained for use as maintenance trains.
The H-5 trains were replaced shortly thereafter by the arrival of more TR-series trains. The last H-5 train made its final service run on June 14, 2013, with a round-trip on the YUS line. That trip began at Wilson station en route to Finch station. On the return trip, the train encountered technical difficulties at Eglinton West station, meaning the train had to go out of service. While many H-5 subway cars were scrapped, some cars were sent to the United States for refurbishing and were expected to be shipped to the Lagos Metropolitan Area Transport Authority of Nigeria for the Lagos Rail Mass Transit project.[8][9]
The H-6s were the only version of the H series still in service when, on June 20, 2014, the last H-6 train took its final run on Line 2 Bloor–Danforth. The round-trip began at Greenwood station, and headed eastbound to Kennedy station, then westbound to Kipling station and back to Kennedy station where the train was decommissioned. This marked the end of all remaining H-series subway trains which had been in service with the TTC after 49 years. (The H-6s were replaced by more T1s, which had been transferred from Line 1 to Line 2 following the arrival of more TR trains.) It was reported that some H-6 cars were to be sold to the Lagos Metropolitan Area Transport Authority for use on a new Lagos Light Rail project (along with some of the already-retired H-5 cars). However, TTC officials later announced that the deal had been cancelled. Only 75 H-5 cars were shipped to Lagos following their retirement in 2013 and all of the H-6s were scrapped after retirement in 2014. However, the 75 H-5 cars sent to the United States were scrapped in August 2015 after Eko Rail decided to purchase newly made cars from the Chinese rolling stock company CRRC Dalian.[10]
- H-1: 5336–5499
- H-2: 5506–5575
- H-3: 5500–5505 (experimental/modified versions of the H-2 that led to development of the H-5)
- H-4: 5576–5663
- H-5: 5670–5807
- H-6: 5810–5935
References
[edit]- ^ a b c Toronto Transit Commission (September 18, 2009). "TTC Service Summary" (PDF). Archived from the original (PDF) on June 29, 2021. Retrieved October 25, 2009.
- ^ Emphasis is on light weight Railway Age 14 June 1965 pages 21–24, 36
- ^ "The Chopper Control Hawkers (Series H-5 and H-6)". Archived from the original on 2011-12-24. Retrieved 2005-10-21.
- ^ "Procurement Authorization – 39 New Subway Trains – Proposal No. P31PD0571" (PDF). Toronto Transit Commission. 30 August 2006. Archived (PDF) from the original on 4 October 2013. Retrieved 15 Oct 2011.
- ^ "Bombardier Signs Contract to Build 234 Subway Cars for Toronto". Bombardier Inc. 31 Dec 2006. Archived from the original on 6 April 2012. Retrieved 15 Oct 2011.
- ^ "Procurement Authorization Amendment – Option to Purchase 31 Additional New Subway Train Sets (For H-6 Subway Car Replacement and TYSSE) (FOR ACTION)" (PDF). Toronto Transit Commission. 6 May 2011. Archived from the original (PDF) on 17 June 2012. Retrieved 15 Oct 2011.
- ^ Tapper, Josh (2012-01-27). "Long-running subway car takes final journey". The Toronto Star. Toronto. Archived from the original on 2012-01-31. Retrieved 2012-01-28.
- ^ Kalinowski, Tess (6 Sep 2011). "TTC subway cars bound for Nigeria". Toronto Star. Archived from the original on 25 October 2012. Retrieved 15 Oct 2011.
- ^ "Eko Rail's Trains Begin Journey to Lagos". PR Newswire. 2011-09-27. Archived from the original on 2021-01-15. Retrieved 2012-12-05.
- ^ "Lagos signs metro agreement with Alstom". International Railway Journal. 2018-07-06. Archived from the original on 2019-05-03. Retrieved 2019-05-03.