CountryNepal
Coordinates27°51′38″N 85°35′24″E / 27.86056°N 85.59000°E / 27.86056; 85.59000
PurposePower
StatusOperational
Owner(s)National Hydropower Company Limited
Dam and spillways
Type of damGravity
ImpoundsIndrawati River
Commission date2059-06-21 BS
TypeRun-of-the-river
Hydraulic head65 m (213 ft)
Installed capacity7.5 MW
Annual generation50 GWh

Indrawati III Hydropower Station (Nepali: इन्द्रावती ३ जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Sindhupalchok District of Nepal. The flow from Indrawati River, a tributary of Sunkoshi River, is used to generate 7.5 MW electricity with annual energy of 50 GWh. The design flow is 14 m3/s and design gross head is 65 m.[1] The plant is owned and developed by National Hydropower Company Limited, an IPP of Nepal. The plant started generating electricity since 2059-06-21 BS. The generation licence will expire in 2104-09-29 BS, after which the plant will be handed over to the government.[2] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority. [3]

See also

[edit]

References

[edit]
  1. ^ Limited, N. H. P. C. (n.d.). Retrieved November 16, 2020, from https://nhpcl.com/
  2. ^ "Operating Projects :: Hydro (Above 1MW)".
  3. ^ Annual Report 2019/2020. Nepal Electricity Authority.