K13 Harpe Bru Bridge
Appearance
K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway.[1][2]
Technical information:
- Extradosed Stay Cable Bridge (Length 320m)
- spans 45+65+100+65+45m
- foundations – piles/flat (founded on rock)
- pylons height 16,0m
Owner:
Design:
- Johs Holt AS
Checking engineering:
Contractor:
Completion: October 2015
References
[edit]- ^ "Implenia | References | Statens vegvesen | K13 Harpe bridge / K14 Solhaug bridge / K21 Vinstersletta bridge". norway.implenia.com. Retrieved 2020-03-10.
- ^ "Norway building first bridge of new type". The Norwegian American. 2016-01-21. Retrieved 2020-03-10.