Jump to content

Kebayoran railway station

From Wikipedia, the free encyclopedia

R03
Kebayoran Station
Stasiun Kebayoran
Kebayoran Station yard in full capacity
General information
Other namesKebayoran Lama Station
LocationJalan Masjid Al-Huda no. 12, Kebayoran Lama Utara, Kebayoran Lama, South Jakarta 12240, Jakarta, Indonesia
Elevation+4,2 m
Owned byKereta Api Indonesia
Operated byKereta Api Indonesia
KAI Commuter
Managed byKAI Commuter
Line(s) Rangkasbitung Line
Platforms
Tracks3 (line 1 and 2: straight tracks)
Connections
  • List of TransJakarta corridors#Corridor 8 Kebayoran
  • List of TransJakarta corridors#Corridor 13 Velbak
Construction
Accessible Available
Other information
Station codeKBY • 0216 • BAYORAN[1]
ClassificationII[1]
History
Opened1 October 1899[2][3]
Rebuilt2014-2016[4]
Electrified1992-1994[5]
Previous namesKebajoran
Original companyStaatsspoorwegen
Services
Preceding station Following station
Palmerah
towards Tanah Abang
Rangkasbitung Line Pondok Ranji

Kebayoran Station (KBY)[1] or commonly known as Kebayoran Lama Station is a class II railway station located near the area of the Kebayoran Lama market, South Jakarta, Jakarta, Indonesia. The station, which is located 4.2 m (14 ft), is the westernmost railway station in Jakarta and only serves KRL Commuterline.

Before used as a KRL Commuterline-only station, Kebayoran Station also served local train trips to Rangkasbitung and Merak stations, until the service was removed on 1 April 2017 and replaced by KRL Commuterline's Green line. It is one of stations on the Merak–Tanah Abang railway that are currently uses a new building besides Maja, Parungpanjang, and Palmerah stations.

History

[edit]

The Staatsspoorwegen built a railway line from Duri to Rangkasbitung via Tanah Abang in order to accommodate passengers from Banten to Batavia. The railway line was inaugurated on 1 October 1899, and the operation of regular trains that serves the route were immediately started.[2][3]

At the time, Kebayoran Station had five tracks and was filled with a series of sand carriages, and a B51 steam locomotive was always ready every day to arrange the carriage shunting, both at the embankments and the branch rails that led to the loading and unloading warehouse. This scene and atmosphere changed in the 1970s, when the shunting locomotive was replaced by the C300 diesel locomotive. Kebayoran Station was also had a branch track towards a material warehouse building which was managed by the Department of Public Works in the form of a hemispherical iron building. The warehouse was used to unload construction materials transported from trains on the branch line for the construction of the Kebayoran Baru satellite city.[6]

The material warehouse lasted until 2001 when it was finally demolished and its former location became the Simprug Center apartment. It was estimated that the former branch track would still be visible until 1985, until they were finally dismantled when a new level crossing was made, at the same time as Jalan Kramat which was located on the branches railbed. The same conditions were created at Rawa Buntu Station, with a branch track to the north that goes to Cisadane River banks to transport construction materials.

In the late-1980s the number of tracks was reduced to only three, and carriage loading and unloading activities had stopped because trucks transporting materials could operate directly to the loading and unloading location.[6]

In 1992–1994, the Tanah AbangSerpong plot was electrified with French model overhead lines, one of which was to support the Serpong Express EMU journey which was touted as the forerunner of the current Rangkasbitung Line.[5] At the time, only tracks 1 and 2 were electrified at the station, with track 3 was only electrified after 2005 with a Japanese-style overhead line pole. In addition, it was estimated that in the early 1990s the station platform was also heightened.

In the early 2000s, the station had a total of 3 tracks, with track 1 as a straight track, track 2 as a turn signal used for both traffic and crossings, and track 3 used for overtaking trains, although this line is sometimes used as a place to store or stabling the Plasser & Theurer maintenance train unit. Since the double track operation on Tanah Abang–Serpong line as of 4 July 2007, the station layout has been overhauled by adding track 2 as a new straight track.[7]

In order to increase the occupancy of KRL Green Line passengers, in 2014-2016 the Ministry of Transportation of Indonesia began major renovation for several stations (including Kebayoran Station) into 2 levels with modern and magnificent architecture and complete facilities. On 11 May 2016, the construction of the three stations were completed and inaugurated by the Director General of Railways, Hermanto Dwiatmoko together with the Regent of Lebak, Iti Octavia Jayabaya, at Maja Station.[4]

Building and layout

[edit]
The original building of Kebayoran station

Even though Kebayoran Station has been renovated to be grand and spacious, the old station building, which is a legacy of Staatsspoorwegen, is still maintained and the train dispatcher room which is also part of the old station building is still in use today. Due to cancellation of regular Rangkas Jaya Train and Kalimaya Train services in 2017, track 3 is rarely used. However, this three station line is still occasionally used as a place for storing or stabling Plasser and Theurer, where this maintenance train unit is usually used to maintain the rail condition on that line. This track is also occasionally used for EMU when it is overtook by short series of coal trains, extraordinary trains, and sometimes it is also used as an EMU stabling place.

R03
G Main building
P

Platform floor

Side platform
Line 1 (Pondok Ranji) Rangkasbitung Line to Serpong/Tigaraksa/Rangkasbitung
Line 2 Rangkasbitung Line to Tanah Abang (Palmerah)
Island platform
Line 3 Rangkasbitung Line to Tanah Abang (Palmerah)
G Main building

Services

[edit]

Passenger services

[edit]

KRL Commuterline

[edit]
Train line name Destination Notes
Rangkasbitung Line Tanah Abang -
Rangkasbitung

Supporting transportation

[edit]

Kebayoran Station is connected with the TransJakarta BRT services on corridor 8 at Pasar Kebayoran Lama bus station and corridor 13 at Velbak bus station via a pedestrian skywalk. The skywalk construction was carried out in March 2022, in order to create a seamless transportation integration by connecting the station with both bus stations.[8]

The skywalk also have supporting facilities, such as elevators that makes a comfortable and easy access for KRL Commuterline and TransJakarta passengers to transfer between two modes.[8][9]

The construction was completed on early 2023, and later underwent a public trial from 21 to 24 January 2023.[10] It was inaugurated on 27 January 2023 by Acting Governor of Jakarta, Heru Budi Hartono.[11][12]

Type Station Route Destination
TransJakarta Kebayoran List of TransJakarta corridors#Corridor 8 Lebak Bulus–Pasar Baru
Velbak List of TransJakarta corridors#Corridor 13 Ciledug–Tegal Mampang
Puri Beta–Pancoran
Puri Beta–Flyover Kuningan (Express)
N/A 1Q (non-BRT) Rempoa–Blok M
8C (MetroTrans) Kebayoran–Tanah Abang Station
Kebayoran 8D (non-BRT) Joglo–Blok M
N/A 8E (non-BRT) Bintaro–Blok M
Pasar Kebayoran Lama 9E (non-BRT) Kebayoran–Jelambar
N/A JAK-11 (MikroTrans Jak Lingko) Kebayoran StationTanah Abang Station
JAK-12 (MikroTrans Jak Lingko) Kebayoran StationTanah Abang Station (via Pos Pengumben)
Mikrolet M09 Kebayoran Lama StationTanah Abang Station
M09A
Angkot S03 Kebayoran Lama Station–Pondok Labu
S07 Kebayoran Lama Station–Pondok Betung, South Tangerang
S10 Kebayoran Lama StationLebak Bulus Grab MRT station (via Tanah Kusir)
C01 Kebayoran Lama Station–CBD Ciledug
D01 Kebayoran Lama Station–Pondok Cabe bus terminal

Incidents

[edit]

1987 train crash

[edit]

A crash occurred on 19 October 1987 when train 225 between RangkasbitungJakarta Kota pulled by a BB306 16 locomotive collided with train 220 between MerakTanah Abang pulled by the BB303 16 locomotive between Kebayoran Station and Sudimara Station in Pondok Betung, Bintaro, South Jakarta. Over 100 people were killed. According to PJKA (now KAI), it was suspected that the train crash happened due to miscommunication between the Kebayoran Station train dispatcher and the Sudimara Station train dispatcher. According to the story, the remnants of the passenger trains from the Bintaro tragedy were pulled over and parked at the Kebayoran Station emplacement in a condition already covered with tarps.[13]

Other incidents

[edit]
  • On 12 November 1988, a year and 24 days after the Bintaro crash, a collision occurred between the train 800 between Tanah AbangParung Panjang pulled by the BB303 15 locomotive and a coal train 1031 between Cigading-Bekasi pulled by the BB304 25 locomotive, no casualties in this incident. The collision occurred at 04.00 a.m., about 20 meters northward towards Palmerah from Jalan Kramat railroad crossing, Kebayoran Lama. The railroad crossing was also closed and could not be passed by vehicles, because it was blocked by a series of coal carriages from KA 1031. The roads around the Kebayoran Lama area became congested, because vehicles and public transport heading towards Blok M were diverted via Kebayoran Lama Street. As a result, the BB303 15 locomotive, which was towing KA 800, was heavily damaged, the cowhanger sank downwards and the body wall was crushed. The two front passenger train units of KA 800 were also heavily damaged and 2 axles of the first passenger train fell. Meanwhile, the BB304 25 locomotive, which was towing KA 1031, only suffered minor damage.[14]
  • On 3 March 2006, the fourth train with number K3 81 1 02 (former MCW 302 DMU) of RangkasbitungJakarta Kota passenger train series pulled by locomotive BB304 18 suffered a broken roof and axle just as it was about to enter the Kebayoran Station yard because the weakened train was not strong enough to support passenger capacity that exceeds its capacity, this occurred at 06.30. The train has experienced a turbulence since departing from Pondok Ranji Station, but the train continues to run at high speed. About 300 meters after crossing Jalan Kebayoran Lama, the train began to shake violently and suddenly broke. 20 people were injured.[15]
  • On 26 June 2008, a series of coal trains PLB 8601 Cigading-Bekasi route pulled by locomotive BB304 22 experienced derailment on the switch at the Kebayoran Station yard (from Pondok Ranji Station), it occurred at 04.43 a.m. The train dispatcher at Kebayoran Station already knows that there was a problem with the switch machine, with the flashing switch on train dispatcher service desk, the train dispatcher cannot give a green signal to PLB 8601 to cross. The train dispatcher immediately checked directly the switch points condition, and made sure the switch points were in a tight position heading to track 2. The train dispatcher also propped up the open position of the switch tongue with a stone, with the aim that the correct position of the point points would not change again when a series of trains passed by. After returning to the room, the train dispatcher saw that the railroad switch light on the PPKA service desk was still flashing. Confident that the switch position was correctly pointing to track 2, Kebayoran Station train dispatcher contacted the control center so PLB 8601 was allowed to cross the Kebayoran Station yard slowly. When crossing the switch at a speed of 15 km/h, the 4 axles of the BB304 22 locomotive that was pulling PLB 8601 finally dropped, because it hit the tip of the switch tongue which was not in a tight position.[16]
[edit]

References

[edit]
  1. ^ a b c Buku Informasi Direktorat Jenderal Perkeretaapian 2014 (PDF) (in Indonesian). Archived from the original (PDF) on 1 January 2020. Retrieved 4 April 2023.
  2. ^ a b "Haltestempels Nederlands Indië: SS-WL". Studiegroep Zuid-West Pacific. Retrieved 4 April 2023.
  3. ^ a b Oegema, J.J.G. (1982). De Stoomtractie op Java en Sumatra. Antwerp: Kluwer Technische Boeken B.V.
  4. ^ a b prima, Erwin (11 May 2016). "Stasiun Baru Kebayoran, Parung Panjang, dan Maja Diresmikan". Tempo (in Indonesian). Retrieved 4 April 2023.
  5. ^ a b "(PPT) Sekilas Elektrifikasi LAA Di Jabotabek". dokumen.tips. Retrieved 5 April 2023.
  6. ^ a b Susanto, A. Stasiun Kebayoran Ambles?.
  7. ^ "SBY Resmikan Stasiun Serpong, Lalu Lintas KA Tetap Normal". detiknews (in Indonesian).
  8. ^ a b "Dinas Bina Marga Bangun Dua Skywalk di Kebayoran Lama dan Lebak Bulus". Republika Online (in Indonesian). 20 June 2022. Retrieved 4 April 2023.
  9. ^ Azzahra, Tiara Aliya (3 January 2023). "Skywalk Kebayoran Lama Rampung Dibangun, Kapan Dioperasikan?". detiknews (in Indonesian). Retrieved 4 April 2023.
  10. ^ Pradewo, Bintang (21 January 2023). "Skywalk Kebayoran Lama Mulai Diuji Coba Hari ini, Cek Jadwalnya - Jawa Pos". Jawa Pos (in Indonesian). Retrieved 4 April 2023.
  11. ^ "Peresmian Skywalk Terpanjang di Jakarta", CNN Indonesia on YouTube, 27 January 2023, retrieved 4 April 2023
  12. ^ "Dinas Perhubungan DKI Jakarta on Instagram: "Penjabat (Pj) Gubernur DKI Jakarta, Bapak Heru Budi Hartono meresmikan Skywalk Kebayoran di Jakarta Selatan, Jumat (27/01/2023). Pada peresmian itu, turut hadir..."". Instagram. Retrieved 4 April 2023.
  13. ^ "Peristiwa Luarbiasa Hebat Bintaro (Versi PJKA) – RODA SAYAP" (in Indonesian). Retrieved 4 April 2023.
  14. ^ "Harian Kompas". Kompas. 1988.
  15. ^ "Gerbong Kereta Jurusan rangkasbitung-Kota Patah, 20 orang Luka". Tempo.co (in Indonesian). 3 March 2006. Retrieved 4 April 2023.
  16. ^ "KA Batubara Anjlok di Kebayoran, Ribuan Pekerja Telat Ngantor". detiknews (in Indonesian).
Preceding station   Kereta Api Indonesia   Following station
Pondok Ranji
towards Merak
  Merak–Tanah Abang   Palmerah
towards Tanah Abang