Oya Hybrid Power Station

Coordinates: 32°49′23″S 20°17′57″E / 32.82306°S 20.29917°E / -32.82306; 20.29917
From Wikipedia, the free encyclopedia

Oya Hybrid Power Station
Map
Official nameOya Energy Hybrid Facility
CountrySouth Africa
LocationBreede Valley, Cape Winelands, Western Cape
Coordinates32°49′23″S 20°17′57″E / 32.82306°S 20.29917°E / -32.82306; 20.29917
StatusProposed
Construction beganH2 2024 Expected
Commission dateH2 2026 Expected
OwnerOya Energy
OperatorOya Energy
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity333 megawatts (447,000 hp)

Oya Hybrid Power Station, also Oya Energy Hybrid Facility, is a hybrid power plant under development in South Africa. The power station comprises: (a) a 155 MW (208,000 hp) solar power plant (b) a 92 MW/242 MWh battery storage power station (BESS) and (c) an 86 MW wind power plant. The power station is owned and under development by a consortium of four independent energy companies. Under a 20-year power purchase agreement (PPA), the power generated here will be sold to Eskom, the national electricity utility company, for integration into the national grid.[1]

Location

[edit]

The power station would be located in the Western Cape Province of South Africa, straddling the border with Northern Cape Province, "between the towns of Ceres and Sutherland".[1]

Overview

[edit]

In 2015, G7 Renewable Energies began planning a stand-alone wind power station. Then a BESS was added. Later as more equity partners were recruited, a solar power station was also added.[1] Through a synchronized mechanism, the hybrid power station is expected to provide a steady 128 MW of dispatchable power from 5am until 9.30pm every day. The single-point synchronization system is reported to employ AI and machine learning.[2][3]

Developers

[edit]

The table below outlines the shareholding in the Oya Energy Hybrid Project. The special purpose vehicle company is Oya Energy. [1]

Oya Energy Shareholding
Rank Shareholder Domicile Percentage Notes
1 Engie France
35.0
[1]
2 G7 Renewable Energies South Africa
20.0
[1]
3 Meadows Energy South Africa
22.5
[1]
4 Perpetua Investment Holdings South Africa
22.5
[1]
Total
100.00

Timeline

[edit]

The hybrid power station project reached financial close in February 2024. It is expected that construction will begin later that same year.[1][4]

See also

[edit]

References

[edit]
  1. ^ a b c d e f g h i Jean Marie Takouleu (16 February 2024). "Solar, wind and storage in one: Oya reaches a milestone in South Africa". Afrik21.africa. Paris, France. Retrieved 18 February 2024.
  2. ^ G7RE (18 February 2024). "Oya Energy Hybrid Facility". G7 Renewable Energies (G7RE). Cape Town, South Africa. Retrieved 18 February 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  3. ^ Pooja Chandak (25 September 2023). "Oya Energy's 128MW Hybrid Renewable Project Advances In South Africa". Solar Quarter. Navi Mumbai, Maharashtra, India. Retrieved 18 February 2024.
  4. ^ Bryan Groenendaal (15 February 2024). "RMIPPPP 128MW Oya Energy Wind/Solar/Battery Hybrid Project Reaches Financial Close In South Africa". Green Building Africa. Johannesburg, South Africa. Retrieved 26 July 2024.
[edit]