Senj Hydroelectric Power Plant

From Wikipedia, the free encyclopedia
CountryCroatia
LocationSenj
Reservoir
CreatesSenj
Senj Hydroelectric Power Plant

Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each[1] having a total capacity of 220 MW.

It is operated by Hrvatska elektroprivreda.[2][3]

Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. [4]

References[edit]

  1. ^ Senj Hydro Power Plant
  2. ^ "HEP-Proizvodnja d.o.o. - HE Senj". www.hep.hr. Archived from the original on 2007-05-13.
  3. ^ "- YouTube". YouTube.
  4. ^ "- YouTube". YouTube.