Jump to content

Talk:Sydney Tar Ponds

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Untitled

[edit]

Outdated content in the Controversy section needs reworking: "A contract for the final engineering design and construction oversight is expected to be awarded by September, 2006" Quickos (talk) 03:10, 19 August 2008 (UTC)[reply]

Assessment

[edit]

Rated the article as C class today, although it needs inline citations per WP:MOS. PKT(alk) 19:07, 23 June 2010 (UTC)[reply]


Being one of canada's largest man-made toxic waste sites, if not the largest, I would say it is of higher importance. Also, the municipal dump is not abandoned. It once ran an incinerator as well as a landfill. The incinerator has closed and the old landfill has been capped but the CBRM dump is still operational. — Preceding unsigned comment added by 131.137.247.6 (talk) 18:15, 21 February 2013 (UTC)[reply]

still is a toxic waste site

[edit]

the first sentence says 'was', but it still is, just encapsulated.--2607:FEA8:FF01:4B63:A1EA:71A2:159A:413F (talk) 01:15, 17 November 2021 (UTC)[reply]