Jump to content

User:Andber08/sandbox

From Wikipedia, the free encyclopedia
Thermal
Yugadanavi Power Station (Q16060180)
The power station as seen from the Colombo Harbour, located 8km away.
Map
Country
Location
StatusOperational
Construction began
  • November 2007
Commission date
  • February 2010
Construction cost
  • $300 million (2009)
  • LTL Holdings
  • West Coast Power
Thermal power station
Primary fuel
Secondary fuel
Tertiary fuel
Turbine technology
Cooling source
Combined cycle?Yes
Power generation
Units operational3 × 100 MW
Make and modelGE Power 9E.03 (2)
Unknown (1)
Nameplate capacity
  • 300 MW
Annual net output
  • 1,800 GWh (2013)
Solar
DeSoto Next Generation Solar Energy Center (Q5244111)
Map
Country
  • United States
StatusOperational
Commission date
  • 27 October 2009
Construction cost
  • $150 million
Solar farm
Type
Site area
  • 95 ha (230 acres)
Power generation
Make and modelsolar cell panel (90000)
Nameplate capacity
  • 25 MW
Annual net output
  • 52 GWh (2012)
External links
Websitewww.fpl.com/environment/solar/desoto.shtml
CommonsRelated media on Commons
Nuclear
Bugey Nuclear Power Plant (Q1186009)
Centrale nucléaire du Bugey
Map
Country
  • France
StatusOperational
Commission date
  • 15 April 1972
Employees
  • 1,703 (2017)
Nuclear power station
Reactors5
Reactor type
Power generation
Units operational2 × 880 MW
2 × 910 MW
Make and modelpressurized water reactor (4)
Units decommissioned1 × 540 MW
Nameplate capacity
  • 3,580 MW
Annual net output
  • 14.58 TW h (2016)
  • 23.9 TW h (2017)
  • 25.1 TW h (2015)
External links
Websitewww.edf.fr/groupe-edf/producteur-industriel/carte-des-implantations/centrale-nucleaire-du-bugey/presentation
CommonsRelated media on Commons
Wind
wind farm on Serra de Rubió (Q11940189)
Parc eòlic nevat 4-02-2015
Map
Country
  • Spain
StatusOperational
Commission date
  • April 2005
Construction cost
  • 55 million € (2005)
Wind farm
Type
Site elevation
  • 820 m (2,690 ft)
Power generation
Units operational50 × 1.5 MW
Make and modelEcotècnia IT-77/1500 (50)
Nameplate capacity
  • 75 MW
Annual net output
  • 105,000 MW h (2006)
External links
CommonsRelated media on Commons
Tidal
Sihwa Lake Tidal Power Station (Q562741)
Map
Official name
  • 시화호조력발전소
Country
StatusOperational
Commission date
  • 3 August 2011
Construction cost
  • $560 million (2011)
Thermal power station
Primary fuel
Tidal power station
Type
Crosses
  • Sihwa lake
Channel volume
  • 7.5 m/s (25 ft/s)
Power generation
Units operational10 × 25.4 MW
Make and modelKaplan turbine (10)
Nameplate capacity
  • 254 MW
Capacity factor
  • 95 %
External links
Websitewww.kwater.or.kr/website/tlight.do
CommonsRelated media on Commons