User:NotOrrio/sandbox

From Wikipedia, the free encyclopedia

Melbourne Airport Railway line[edit]

Melbourne Airport
Railways in Melbourne
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusUnder Construction
First service2029 (proposed)
Current operator(s)Metro Trains (proposed)
Route
Termini{ubl|Pakenham|Cranbourne}
Melbourne Airport
Line(s) used
Technical
Rolling stockHCMT (proposed)

History[edit]

Planning[edit]

Construction[edit]

Network and Operations[edit]

Planned Route[edit]

Planned Stations[edit]

Legend

*-The following station is not open yet and thus not all information will be accurate by the time it opens

Station Accessibility Opened Terrain Train connections Planned connections Notes
Anzac* Yes—step free access 2025[1] Underground
3 connections
Trams Opening as part of the Metro tunnel project in 2025[1]
Town Hall* Trains Trams Buses Trains
State Library* Trains Trams Buses
Parkville* Trams
Arden*
Footscray No—steep ramp 1859 Ground Trams Buses
Middle Footscray No—steep ramp 1906
1 connection
Buses
West Footscray Yes—step free access 1888
Tottenham No—steep ramp 1891
Sunshine Yes—step free access 1885
1 connection
Buses
Keilor East* 2029 Opening in 2029 alongside the airport line's opening
Melbourne Airport* Elevated Buses

Infrastructure[edit]

Planned Rollingstock[edit]

  1. ^ a b Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Retrieved 9 December 2022.