Yerwada metro station
Yerwada | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pune Metro station | |||||||||||
General information | |||||||||||
Location | Kharadi, Pune, Maharashtra 411006 | ||||||||||
Coordinates | 18°32′43″N 73°53′11″E / 18.545265°N 73.886498°E | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Operated by | Pune Metro | ||||||||||
Line(s) | Aqua Line | ||||||||||
Platforms | Side platform Platform-1 → Ramwadi Platform-2 → Vanaz | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | RUC | ||||||||||
History | |||||||||||
Opened | 6 March 2024 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
Yerwada is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System.[1] The station was opened on 6 March 2024 as an extension of Pune Metro Phase I.[2][1] Aqua Line operates between Vanaz and Ramwadi stations.[3][4][5] Though this stretch was inaugurated on March 6, 2024, pending works have forced this station to be exempted for commercial operations for more than a month, unlike the other three stations opened in this stretch inaugurated along with this station.[6][7]
The facade of the station showcases an illustration of Dandi March and a charkha, both of which are inspired by and a tribute to Mahatma Gandhi.[8] It is expected to open for operations in May 2024 as the work on the revised entry-exit point is expected to complete by the end of April 2024.[9]
Station layout[edit]
Bund Garden track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Ramwadi next station is Kalyani Nagar | |
Platform 2 Westbound |
Towards ← Vanaz next station is Bund Garden | |
Side platform | Doors will open on the left | ||
L3 |
Entry/Exit[edit]
This section is empty. You can help by adding to it. (March 2024) |
See also[edit]
References[edit]
- ^ a b "Feeder buses to link Yerawada Metro station with Pune airport". The Indian Express. 12 December 2023. Retrieved 7 March 2024.
- ^ "PM Modi inaugurates Pune Metro route extension; these three new stations will be operational from today". The Indian Express. 6 March 2024. Retrieved 7 March 2024.
- ^ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
- ^ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 4 August 2023.
- ^ "Pune Metro's reach set to expand up to 30 km". Hindustan Times. 6 March 2024. Retrieved 7 March 2024.
- ^ "Demand grows to replan entry-exit points to Yerawada Metro station in Pune". The Times of India. 6 October 2023. ISSN 0971-8257. Retrieved 7 March 2024.
- ^ "Month-long wait before Yerawada Metro station becomes operational". The Times of India. 28 February 2024. ISSN 0971-8257. Retrieved 7 March 2024.
- ^ "With wadas, pagdis and Dandi March, Pune Metro to offer a ride through city's culture, history". The Indian Express. 21 December 2022. Retrieved 21 April 2024.
- ^ Dastane, Sarang (17 April 2024). "Yerawada station likely to start operations next month". The Times of India. p. 6.